Carrier 23 XL Ð Motor Cooling Drain Section, Frame 4 Machines, Ð Oil Separator Section

Models: 23 XL

1 36
Download 36 pages 34.69 Kb
Page 15
Image 15
Fig. 11 Ð Motor Cooling Drain Section

2.Cover all openings.

3.Be sure the switches, sensor, and transducers are disconnected.

4.Cut oil separator from its support foot.

5.Rig oil separator.

Additional Notes For Frame 1, 2, and 4 Machines:

1.Use silicon grease on new O-rings when re®tting.

2.Use gasket sealant on new gaskets when re®tting.

3.Cooler and condenser may be vertically rigged. Rigging should be ®xed to 4 corners of the cooler and condenser tube sheet.

Fig. 11 Ð Motor Cooling Drain Section

(Frame 4 Machines)

Fig. 12 Ð Oil Separator Section

 

(Frame 4 Machines)

 

 

 

 

15

796

Page 15
Image 15
Carrier 23 XL installation instructions Ð Motor Cooling Drain Section, Frame 4 Machines, Ð Oil Separator Section