Sun Microsystems X4200 M2, X4100 M2 manual Installing the Server Into the Slide Rail Assemblies

Page 14

Installing the Server Into the Slide Rail

Assemblies

Use this procedure to install the server chassis, with mounting brackets, into the slide-rail assemblies that are mounted to the rack.

Caution – This procedure requires a minimum of two people because of the weight of the server. Attempting this procedure alone could result in equipment damage or personal injury.

1.Push the slide-rails into the slide-rail assemblies as far as possible.

2.Raise the server so that the rear ends of the mounting brackets are aligned with the slide-rail assemblies that are mounted in the equipment rack. See FIGURE 1-4.

3.Insert the mounting brackets into the slide-rails, then push the server into the rack until the mounting brackets encounter the slide-rail stops (approximately 12 inches or 30 cm).

Slide-rail assembly mounted on rack post

Mounting bracket inserted into slide-rail

Slide-rail

Slide-rail locks

release button

 

FIGURE 1-4Inserting the Server With Mounting Brackets Into the Slide-Rails

6 Sun Fire X4100/X4100 M2 and X4200/X4200 M2 Servers Installation Guide • May 2007

Image 14
Contents Sun Microsystems, Inc Page Contents Index Preface Related DocumentationThird-Party Web Sites Product UpdatesUsing Unix Commands Typographic Conventions Sun Welcomes Your CommentsPage Setting Up the Server Hardware Installation OverviewInstalling the Server Into a Rack With Optional Slide Rails Disassembling the Slide Rails Before Installation Unpack the slide-railsInstalling the Mounting Brackets Onto the Server Mounting bracket3Slide-Rail Assembly Mounting to Rack Post Attaching the Slide-Rail Assemblies to the RackInstalling the Server Into the Slide Rail Assemblies Installing the Cable Management Assembly CMA rail extension Left slide-rail Right slide-rail CMA mounting bracket CMA extension arm On left slide-rail Tab CMA arm connector 10Installing CMA Cable Hangers Attaching and Routing CablesVerifying Operation of the Slide Rails and CMA Cabling NET MGTSun Fire X4100/X4200 servers Continue with Powering On and Off the Server on Powering On and Off the Server Powering On Main Power Mode Shutting Down Main Power ModePage Setting Up the Server Software Introduction to the Integrated Lights Out ManagerPage Connecting to the Ilom Service Processor Connecting to Ilom Using a Serial ConnectionTo start the serial console, you can type cd /SP/console Connecting to Ilom Using an Ethernet Connection Configuring Ilom Ethernet Settings Using Dhcp# ssh -l root 2Opening a Session With an SSH Command-Line Interface Configuring Ilom Using Static Ethernet Settings Configuring Static IP Addresses Using the CLI Configuring Static IP Addresses Using the Bios Setup Utility Setting Up Platform Operating System and Driver Software Page Configuring the Preinstalled Solaris 10 Operating System Before You BeginInstallation Worksheet Worksheet for InstallationConfiguring the Preinstalled Solaris 10 Operating System Worksheet for Installation Selecting Your Console Output ExampleConfiguring the Preinstalled Solaris 10 Operating System To Connect to the Server Using a Terminal Program onSelect the IP Address menu item To Connect to the Server Using a Terminal Program Follow the Solaris 10 preinstallation on-screen promptsSolaris 10 OS Training Solaris 10 User DocumentationDownloading Solaris 10 OS Software Page Index Ilom
Related manuals
Manual 48 pages 15.89 Kb