Sun Microsystems 2000E installation manual Figures

Page 5

Figures

Figure 2-1

Key Switch Positions

2-3

Figure 2-2

AC Distribution Unit Power Switch

2-3

Figure 2-3

Removing the Power Supply Compartment EMI Panel

2-5

Figure 2-4

Disconnecting the Top Power Supply Power Cord

2-6

Figure 2-5

Removing the Power Supply Cage Cover Panel

2-7

Figure 2-6

AC Distribution Unit Removal and Replacement

2-7

Figure 2-7

Removing the Power Breaker Box

2-8

Figure 2-8

Freeing the Filter Cable

2-9

Figure 2-9

Installing the Bottom Power Supply

2-10

Figure 2-10

Installing the Power Supply Mounting Screws

2-11

Figure 2-11

Installing the Bottom Cover Panel

2-12

Figure 2-12

Installing the Main Bus Bar

2-13

Figure 2-13

Installing Power Harness on the Top and Bottom Power Supply

 

Terminal Blocks

2-14

Figure 2-14

Installing the Main Bus Bar and the Power Harness

2-14

Figure 2-15

Plugging the Filter Cable into the Bottom Power Supply . . . .

2-15

Figure 2-16

Replacing the Power Breaker Box

2-16

v

Image 5
Contents SPARCcenter 2000E Power Supply Installation Manual Trademarks Contents SPARCserver 2000E Power Supply Installation Manual-April Figures SPARCserver 2000E Power Supply Installation Manual-April Tables Viii How This Book Is Organized Power Supply Installation, explains how to performPreface Application Title Part Number Related DocumentsWhat Typographic Changes Mean Shell Prompts in Command ExamplesXii Before You Start Safety PrecautionsProblem Precaution SymbolsOFF Tools Required Power Supply Installation Operating System Open Boot PromPowering Down the System OnDiagnostics Secure Standby Identifying a Redundant-Capable Cabinet AccessInstalling the Bottom Power Supply Preparation Installing the SupplyDisconnect the top power supply power cord 4Disconnecting the Top Power Supply Power Cord Remove the power supply cage cover panelRemove the AC Distribution Unit Remove the Breaker Box Filter Cable Power Supply Physical InstallationPower supply cage Screws 6 places Tighten all nuts and screws installed in and Step Main Bus Bar InstallationInstall the bottom cover panel 12Installing the Main Bus Bar Power Harness Installation+12V +12V Return Power harness Part Plug in the filter cable Cabling16Replacing the Power Breaker Box Place the breaker box against power supply cage17Connecting the Power Cords Plug it into J1 near the top of the supply Power Supply Sense Cable19Replacing the Power Supply Compartment EMI Panel Restore the SystemRestarting the System Turn the key switch to Power-on position. See FigureRemote Local Watch the terminal screen for any Post error messages 21System Reset Switch Reading Boot MessagesDC power green Fault yellow System running green Bottom Top Power Supply SPARCserver 2000E Power Supply Installation Manual-April Opening the Hinged Door AccessRemoval Procedures 1Opening the Hinged Door Removing the Vented Front Panels2Removing the Vented Front Panels Removing the Side Panels3Removing the Side Panels Removing the EMI Shield4Removing the EMI Shield Rear Screen PanelEMI Panel Closing the SystemSide Panels Vented Front PanelSPARCserver 2000E Power Supply Installation Manual-April Revision History SPARCserver 2000E Power Supply Installation Manual-April Reader Comments Business Reply Mail