Paradyne 12000E installation instructions Establishing Your Uplink Connections

Page 14

7.Verify the connection. Turn your power source(s) on. The PWR (power) LED on the interface module and management module faceplates will illuminate solid green to indicate the modules are receiving power.

MANAGEMENT MODULE

INTERFACE

MODULE

 

Power LED

Power LED

Establishing Your Uplink Connections

No configuration is necessary for Uplink Interface Modules (UIMs) or Media Interface Modules (MIMs) installed on the management module(s) in your 12000E to operate at default settings. However, if you wish to run your uplink connections at settings other than the UIM or MIM defaults, configure the UIM or MIM prior to connection.

For further connection and configuration information, refer to the installation instructions of your particular UIM or MIM.

Uplink Module

14

July 2005

IPD1-A2-GZ40-10

Image 14
Contents Contents Software and Firmware License AgreementJuly IPD1-A2-GZ40-10 Introduction Unpacking and Inspecting the EquipmentInstallation Options Installation on a TabletopInstalling in a Rack Installing Your Management Module Installing a Management ModuleManagement Module Slots Management Module Installing Your Interface Modules July IPD1-A2-GZ40-10 Powering Up Your 12000E DC Terminal Block DC Power Terminal Establishing Your Uplink Connections Connecting Your Subscriber Lines Female RJ21 Connector a For Interface Module Slot IPD1-A2-GZ40-10 July Configuration and Management Product Documentation OnlineFan Module Specifications Specifications CriteriaImportant Safety Instructions United States EMI Notice Warranty, Sales, Service, and Training Information Canada EMI NoticeIPD1-A2-GZ40-10