Patton electronic 4400 manual Safety when working with electricity

Page 11

SmartNode 4400 Series Getting Started Guide

About this guide

 

 

Safety when working with electricity

 

The SmartNode contains no user serviceable parts. The equipment shall be

 

returned to Patton Electronics for repairs, or repaired by qualified service per-

WARNING

sonnel. Opening the SmartNode case will void the warranty.

 

 

Mains Voltage: Do not open the case the when the power cord is attached.

 

Line voltages are present within the power supply when the power cords are

WARNING

connected. The mains outlet that is utilized to power the device shall be

within 10 feet (3 meters) of the device, shall be easily accessible, and pro-

 

tected by a circuit breaker.

 

For AC powered units, ensure that the power cable used meets all applicable

 

standards for the country in which it is to be installed, and that it is connected

WARNING

to a wall outlet which has earth ground.

 

 

The Model SN4400 is not shipped with power cables. For AC powered units,

 

ensure that the power cable used meets all applicable standards for the coun-

WARNING

try in which it is to be installed, and that it is connected to a wall outlet which

has earth ground.

 

Hazardous network voltages are present in WAN ports regardless of whether

 

power to the SmartNode is ON or OFF. To avoid electric shock, use caution

WARNING

when near WAN ports. When detaching the cables, detach the end away from

the SmartNode first.

 

Because telephone line voltages can be dangerous, when detaching the net-

 

work cables, disconnect the end away from the SmartNode first.

WARNING

 

 

Do not work on the system or connect or disconnect cables during periods of

 

lightning activity.

WARNING

 

 

In accordance with the requirements of council directive 2002/

 

96/EC on Waste of Electrical and Electronic Equipment (WEEE),

 

ensure that at end-of-life you separate this product from other

 

waste and scrap and deliver to the WEEE collection system in

 

your country for recycling.

11

Image 11
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Getting started with the SmartNode 4400 Series Port pin-outs List of Figures List of Tables Structure PrecautionsAbout this guide AudienceAbout this guide Sonnel. Opening the SmartNode case will void the warranty Safety when working with electricityGeneral observations Preventing Electrostatic Discharge DamageGeneral conventions Typographical conventions used in this documentGeneral information Chapter contentsModel SN4432 IpChannel Bank SmartNode 4400 Series overviewSmartNode 4400 Series detailed description SmartNode 4400 Series front panel Power Solid Green Power is appliedTelco ports Console port Ethernet ports SmartNode 4400 Series rear panelsReset button behavior Applications overview SmartNode 4400 Series applications IntroductionLegacy MTU/MDU migration to VoIP based networks Bulk analog line extensionsHardware installation Planning the installation Site log Installation checklistConfiguration tools AC Power MainsNetwork information Unpacking the Model SN4400 series IpChannel Bank Installing the IpChannel BankIpChannel Bank chassis installation Location and mounting requirementsConnecting the FXS ports Connecting cablesModel SN4400 Ethernet port Grounding the Model SN4400-AC and DC units Connecting powerInstalling the power cables-AC units Installing the power cables-DC units DC connector, -DC and +DC input view Getting started with SmartNode 4400 Series Connecting the SmartNode to your laptop PC Configure IP address Factory-default IP settingsConnect to the RS-232 console port Connecting to the RS-232 Console portChanging the WAN IP address LoginLoading the configuration optional Connecting the SmartNode to the networkStart Bootloader BootloaderLoad a new application image SmartWare via Tftp Start-up with factory configurationCopy tftp//tftpserveraddress/server path/b1 flash Load a new application image SmartWare via the serial link Additional informationContacting Patton for assistance Contact information Warranty coverageRMA numbers Out-of-warranty serviceAppendix a Compliance information Authorized European Representative Safety complianceCompliance CE Declaration of ConformityAppendix B Specifications Console port Voice processing signaling dependentVoice connectivity FXS Ethernet interfaceFax and modem support Voice signalingOperating environment IP servicesVoice routing-session router ManagementSystem DimensionsWeight and power dissipation Power supplySmartNode Model SysObjectID Identification of the SmartNode devices via SnmpAppendix C Port pin-outs EIA-561 RJ-45 8-pin port Ethernet 10Base-T and 100Base-T portBlue Purple Blue Band marked color-codes for the 50-pin RJ-21X connector Violet Appendix D Factory Configuration Factory Configuration Appendix E End user license agreement End User License Agreement Other licenses TerminationAppendix F Installation checklist Task Verified by Date Appendix G Accessories Description Part Number