Patton electronic 4400 manual Task Verified by Date

Page 67

SmartNode 4400 Series Getting Started Guide

F • Installation checklist

 

 

Introduction

This appendix lists the tasks for installing a SmartNode 4400 IpChannel Bank (see table 12). Make a copy of this checklist and mark the entries as you complete each task. For each IpChannel Bank, include a copy of the completed checklist in your site log.

Table 12. Installation checklist

Task

Verified by

Date

 

 

 

Network information available & recorded in site log

 

 

 

 

 

Environmental specifications verified

 

 

 

 

 

Site power voltages verified

 

 

 

 

 

Installation site pre-power check completed

 

 

 

 

 

Required tools available

 

 

 

 

 

Additional equipment available

 

 

 

 

 

All printed documents available

 

 

 

 

 

SmartWare release & build number verified

 

 

 

 

 

Rack, desktop, or wall mounting of chassis completed

 

 

 

 

 

Initial electrical connections established

 

 

 

 

 

ASCII terminal attached to console port

 

 

 

 

 

Cable length limits verified

 

 

 

 

 

Initial configuration performed

 

 

 

 

 

Initial operation verified

 

 

 

 

 

Introduction

67

Image 67
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Getting started with the SmartNode 4400 Series Port pin-outs List of Figures List of Tables Structure PrecautionsAbout this guide AudienceAbout this guide Sonnel. Opening the SmartNode case will void the warranty Safety when working with electricityGeneral observations Preventing Electrostatic Discharge DamageGeneral conventions Typographical conventions used in this documentGeneral information Chapter contentsModel SN4432 IpChannel Bank SmartNode 4400 Series overviewSmartNode 4400 Series detailed description SmartNode 4400 Series front panel Power Solid Green Power is appliedTelco ports Console port Ethernet ports SmartNode 4400 Series rear panelsReset button behavior Applications overview SmartNode 4400 Series applications IntroductionLegacy MTU/MDU migration to VoIP based networks Bulk analog line extensionsHardware installation Planning the installation Site log Installation checklistNetwork information AC Power MainsConfiguration tools Unpacking the Model SN4400 series IpChannel Bank Installing the IpChannel BankIpChannel Bank chassis installation Location and mounting requirementsConnecting the FXS ports Connecting cablesModel SN4400 Ethernet port Grounding the Model SN4400-AC and DC units Connecting powerInstalling the power cables-AC units Installing the power cables-DC units DC connector, -DC and +DC input view Getting started with SmartNode 4400 Series Connecting the SmartNode to your laptop PC Configure IP address Factory-default IP settingsConnect to the RS-232 console port Connecting to the RS-232 Console portChanging the WAN IP address LoginLoading the configuration optional Connecting the SmartNode to the networkStart Bootloader BootloaderLoad a new application image SmartWare via Tftp Start-up with factory configurationCopy tftp//tftpserveraddress/server path/b1 flash Load a new application image SmartWare via the serial link Additional informationContacting Patton for assistance Contact information Warranty coverageRMA numbers Out-of-warranty serviceAppendix a Compliance information Authorized European Representative Safety complianceCompliance CE Declaration of ConformityAppendix B Specifications Console port Voice processing signaling dependentVoice connectivity FXS Ethernet interfaceFax and modem support Voice signalingOperating environment IP servicesVoice routing-session router ManagementSystem DimensionsWeight and power dissipation Power supplySmartNode Model SysObjectID Identification of the SmartNode devices via SnmpAppendix C Port pin-outs EIA-561 RJ-45 8-pin port Ethernet 10Base-T and 100Base-T portBlue Purple Blue Band marked color-codes for the 50-pin RJ-21X connector Violet Appendix D Factory Configuration Factory Configuration Appendix E End user license agreement End User License Agreement Other licenses TerminationAppendix F Installation checklist Task Verified by Date Appendix G Accessories Description Part Number