Patton electronic 4400 manual Hardware installation, Chapter contents

Page 23

Chapter 3

Hardware installation

 

Chapter contents

 

 

Introduction

24

Planning the installation

24

Installation checklist

25

Site log

25

Network information

26

Network diagram

26

IP related information

26

Configuration tools

26

AC Power Mains

26

Location and mounting requirements

27

Installing the IpChannel Bank

27

Unpacking the Model SN4400 series IpChannel Bank

27

IpChannel Bank chassis installation

27

Connecting cables

28

Connecting the FXS ports

28

Connecting the Ethernet ports

28

Connecting the 10/100Base-T Ethernet ports to an Ethernet switch or hub

29

Connecting a 10/100Base-T Ethernet port to an Ethernet-capable workstation

29

Connecting the EIA-561RS-232 configuration port (DCE configured)

30

Connecting power

30

Grounding the Model SN4400—AC and DC units

30

Installing the power cables—AC units

31

Installing the power cables—DC units

32

23

Image 23
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Getting started with the SmartNode 4400 Series Port pin-outs List of Figures List of Tables Structure PrecautionsAbout this guide AudienceAbout this guide Sonnel. Opening the SmartNode case will void the warranty Safety when working with electricityGeneral observations Preventing Electrostatic Discharge DamageGeneral conventions Typographical conventions used in this documentGeneral information Chapter contentsModel SN4432 IpChannel Bank SmartNode 4400 Series overviewSmartNode 4400 Series detailed description SmartNode 4400 Series front panel Power Solid Green Power is appliedTelco ports Console port Ethernet ports SmartNode 4400 Series rear panelsReset button behavior Applications overview SmartNode 4400 Series applications IntroductionLegacy MTU/MDU migration to VoIP based networks Bulk analog line extensionsHardware installation Planning the installation Site log Installation checklistConfiguration tools AC Power MainsNetwork information Unpacking the Model SN4400 series IpChannel Bank Installing the IpChannel BankIpChannel Bank chassis installation Location and mounting requirementsConnecting the FXS ports Connecting cablesModel SN4400 Ethernet port Grounding the Model SN4400-AC and DC units Connecting powerInstalling the power cables-AC units Installing the power cables-DC units DC connector, -DC and +DC input view Getting started with SmartNode 4400 Series Connecting the SmartNode to your laptop PC Configure IP address Factory-default IP settingsConnect to the RS-232 console port Connecting to the RS-232 Console portChanging the WAN IP address LoginLoading the configuration optional Connecting the SmartNode to the networkStart Bootloader BootloaderLoad a new application image SmartWare via Tftp Start-up with factory configurationCopy tftp//tftpserveraddress/server path/b1 flash Load a new application image SmartWare via the serial link Additional informationContacting Patton for assistance Contact information Warranty coverageRMA numbers Out-of-warranty serviceAppendix a Compliance information Authorized European Representative Safety complianceCompliance CE Declaration of ConformityAppendix B Specifications Console port Voice processing signaling dependentVoice connectivity FXS Ethernet interfaceFax and modem support Voice signalingOperating environment IP servicesVoice routing-session router ManagementSystem DimensionsWeight and power dissipation Power supplySmartNode Model SysObjectID Identification of the SmartNode devices via SnmpAppendix C Port pin-outs EIA-561 RJ-45 8-pin port Ethernet 10Base-T and 100Base-T portBlue Purple Blue Band marked color-codes for the 50-pin RJ-21X connector Violet Appendix D Factory Configuration Factory Configuration Appendix E End user license agreement End User License Agreement Other licenses TerminationAppendix F Installation checklist Task Verified by Date Appendix G Accessories Description Part Number