2.Replace the control panel.
3.Make sure all other hardware installations are complete.
4.Switch the power source selector on the back panel to AC or DC according to the type of power supply(s) you are using.
5.Plug one end of the power cord into the socket on the back panel.
6.Plug the other end to a properly rated power source.
7.Turn on the master power.
NMS Overview
The ZyXEL NMS consists of the
2127( ,))25$1<5($621<28&+226(1277286(7+(=<9,(:106$1<6103 3/$7)250&$1%(86('720$1$*(7+(5$&.
Configuring the RS-1612 rack
Follow the steps given below to configure your
1.Use an
2.From your terminal use a communications program such as Microsoft Hyper Terminal for Windows 95 to enter the data format as follows:
9600, N, 8, 1
13