Texas Instruments
bq24010/2
manual
2.1 I/O and Jumper Connections, Test Procedure
Schematic
Equipment Setup
2. Assembly View
Test Procedure
PMP Portable Power
Page 10
Page 9
Page 11
Image 10
Page 9
Page 11
Contents
User’s Guide
SLUU125A
PMP Portable Power
January
IMPORTANT NOTICE
EVM IMPORTANT NOTICE
EVM WARNINGS AND RESTRICTIONS
Figures
Contents
3 Schematic, Physical Layouts, and Bill of Materials
Tables
Contents
Page
Introduction
Chapter
Topic
Table 1-1. Performance Specification Summary
1.2 Performance Specification Summary
1.1 Background
Test Summary
Test Summary
2.2 Test Procedure
2.1 I/O and Jumper Connections
In place of a battery, a source meter that can sink current can easily be adjusted to test each mode
2.2.1 Equipment
2.2.2 Equipment Setup
2.2.3 Procedure
Figure 2-1. Load Test Board
4 Verify that output voltage BAT+ settles between 3.2 V and 3.95
Schematic, Physical Layouts, and Bill of Materials
Schematic, Physical Layouts, and Bill of Materials
Schematic
Physical Layouts
3.1 Schematic
1 µ F
3.2.1 Board Layout
Figure 3-2. Assembly View
3.2 Physical Layouts
Physical Layouts
Figure 3-3. Top Layer Figure 3-4. Bottom Layer
Table 3-1. Bill of Materials
3.3 Bill of Materials
3.4 Reference
Bill of Materials
Related pages
All Procedure page
D. FURNACE CHECKOUT PROCEDURE for Thermo Products 125n
Adjustment Procedures for Icom IC F121S
What are the specifications of the
Delta TP400LS
?
Top
Page
Image
Contents