Texas Instruments
bq24010/2
manual
Introduction, Chapter, Page, Topic
Schematic
Equipment Setup
2. Assembly View
Test Procedure
PMP Portable Power
Page 7
Page 6
Page 8
Image 7
Page 6
Page 8
Contents
January
SLUU125A
PMP Portable Power
User’s Guide
IMPORTANT NOTICE
EVM IMPORTANT NOTICE
EVM WARNINGS AND RESTRICTIONS
Tables
Contents
3 Schematic, Physical Layouts, and Bill of Materials
Figures
Contents
Topic
Introduction
Chapter
Page
Table 1-1. Performance Specification Summary
1.2 Performance Specification Summary
1.1 Background
Test Summary
Test Summary
2.1 I/O and Jumper Connections
2.2 Test Procedure
In place of a battery, a source meter that can sink current can easily be adjusted to test each mode
Figure 2-1. Load Test Board
2.2.2 Equipment Setup
2.2.3 Procedure
2.2.1 Equipment
4 Verify that output voltage BAT+ settles between 3.2 V and 3.95
Physical Layouts
Schematic, Physical Layouts, and Bill of Materials
Schematic
Schematic, Physical Layouts, and Bill of Materials
1 µ F
3.1 Schematic
Physical Layouts
Figure 3-2. Assembly View
3.2 Physical Layouts
3.2.1 Board Layout
Figure 3-3. Top Layer Figure 3-4. Bottom Layer
Bill of Materials
3.3 Bill of Materials
3.4 Reference
Table 3-1. Bill of Materials
Related pages
Setup troubleshooting for Lexmark Z600
Specifications for Harbor Freight Tools 92427
Error Messages for Brother CS6000I
Series Chartplotter Accessories for Humminbird 786CI
Precautions When Using CADMIUM-FREE Contact Type for Panasonic AJ9 (J9)
Wall Mount Install Ation for Curtis LCD3227A-2
How to use the parts lists and diagrams for HP 400
Manufacturer code list for JVC XV-S302SL
General Setup Menu Fields for ZyXEL Communications 641
Can I perform maintenance without consulting the
Middleby manuals
?
Top
Page
Image
Contents