Texas Instruments
bq24010/2
manual
Verify that output voltage BAT+ settles between 3.2 V and 3.95
Schematic
Equipment Setup
2. Assembly View
Test Procedure
PMP Portable Power
Page 13
Page 12
Page 14
Image 13
Page 12
Page 14
Contents
PMP Portable Power
SLUU125A
User’s Guide
January
IMPORTANT NOTICE
EVM IMPORTANT NOTICE
EVM WARNINGS AND RESTRICTIONS
3 Schematic, Physical Layouts, and Bill of Materials
Contents
Figures
Tables
Contents
Chapter
Introduction
Page
Topic
Table 1-1. Performance Specification Summary
1.2 Performance Specification Summary
1.1 Background
Test Summary
Test Summary
2.1 I/O and Jumper Connections
2.2 Test Procedure
In place of a battery, a source meter that can sink current can easily be adjusted to test each mode
2.2.3 Procedure
2.2.2 Equipment Setup
2.2.1 Equipment
Figure 2-1. Load Test Board
4 Verify that output voltage BAT+ settles between 3.2 V and 3.95
Schematic
Schematic, Physical Layouts, and Bill of Materials
Schematic, Physical Layouts, and Bill of Materials
Physical Layouts
1 µ F
3.1 Schematic
3.2 Physical Layouts
Figure 3-2. Assembly View
3.2.1 Board Layout
Physical Layouts
Figure 3-3. Top Layer Figure 3-4. Bottom Layer
3.4 Reference
3.3 Bill of Materials
Table 3-1. Bill of Materials
Bill of Materials
Related pages
Troubleshooting for Samsung AR12MSFPEWQNEU
Technical specifications for AT&T EP5632
HC100 Wireless Status Indicator Lights for Zebra Technologies P1043301-005
Wiring Diagram for Rinnai EX22C
HOW to USE Your Lawn Mower for Craftsman 917.389061
Installing the batteries for Samsung VCR8875T3A/XEF
Instructions Parts List for Hitachi 236464
TV Brand Code List for Samsung HTDS470RH/EDC
What tools do I need for
replacing parts on the EB7001
?
Top
Page
Image
Contents