Texas Instruments
bq24010/2
manual
1. Load Test Board, Equipment Setup, Procedure
Schematic
Equipment Setup
2. Assembly View
Test Procedure
PMP Portable Power
Page 12
Page 11
Page 13
Image 12
Page 11
Page 13
Contents
SLUU125A
PMP Portable Power
User’s Guide
January
IMPORTANT NOTICE
EVM IMPORTANT NOTICE
EVM WARNINGS AND RESTRICTIONS
Contents
3 Schematic, Physical Layouts, and Bill of Materials
Figures
Tables
Contents
Introduction
Chapter
Page
Topic
1.2 Performance Specification Summary
Table 1-1. Performance Specification Summary
1.1 Background
Test Summary
Test Summary
2.2 Test Procedure
2.1 I/O and Jumper Connections
In place of a battery, a source meter that can sink current can easily be adjusted to test each mode
2.2.2 Equipment Setup
2.2.3 Procedure
2.2.1 Equipment
Figure 2-1. Load Test Board
4 Verify that output voltage BAT+ settles between 3.2 V and 3.95
Schematic, Physical Layouts, and Bill of Materials
Schematic
Schematic, Physical Layouts, and Bill of Materials
Physical Layouts
3.1 Schematic
1 µ F
Figure 3-2. Assembly View
3.2 Physical Layouts
3.2.1 Board Layout
Physical Layouts
Figure 3-3. Top Layer Figure 3-4. Bottom Layer
3.3 Bill of Materials
3.4 Reference
Table 3-1. Bill of Materials
Bill of Materials
Related pages
All Setup page
Establishing a Setup or Power-On password for HP 800 G1
Save & Exit Setup for Gigabyte GA-K8S760M
Using the Setup Menu for Samsung DVD-V9500
Setup for NEC 4600N
Sending setup for Samsung CLX-3305FW
Using Wi-Fi Protected Setup for Belkin PM01110-A
Setting Up Your Remote Control for Samsung HPN4239
Deschiderea casetei de dialog Page Setup for Canon MP550
Visit the Setup application for Blackberry 9800
Setting up for Palm 680
Are there common issues found in the
bryant thermostat wiring diagram
?
Top
Page
Image
Contents