Texas Instruments
bq24010/2
manual
Test Summary, Chapter, Page, Topic
Schematic
Equipment Setup
2. Assembly View
Test Procedure
PMP Portable Power
Page 9
Page 8
Page 10
Image 9
Page 8
Page 10
Contents
PMP Portable Power
SLUU125A
User’s Guide
January
IMPORTANT NOTICE
EVM IMPORTANT NOTICE
EVM WARNINGS AND RESTRICTIONS
3 Schematic, Physical Layouts, and Bill of Materials
Contents
Figures
Tables
Contents
Chapter
Introduction
Page
Topic
1.2 Performance Specification Summary
Table 1-1. Performance Specification Summary
1.1 Background
Test Summary
Test Summary
2.1 I/O and Jumper Connections
2.2 Test Procedure
In place of a battery, a source meter that can sink current can easily be adjusted to test each mode
2.2.3 Procedure
2.2.2 Equipment Setup
2.2.1 Equipment
Figure 2-1. Load Test Board
4 Verify that output voltage BAT+ settles between 3.2 V and 3.95
Schematic
Schematic, Physical Layouts, and Bill of Materials
Schematic, Physical Layouts, and Bill of Materials
Physical Layouts
1 µ F
3.1 Schematic
3.2 Physical Layouts
Figure 3-2. Assembly View
3.2.1 Board Layout
Physical Layouts
Figure 3-3. Top Layer Figure 3-4. Bottom Layer
3.4 Reference
3.3 Bill of Materials
Table 3-1. Bill of Materials
Bill of Materials
Related pages
Parts List for Troy-Bilt 440
How does the Toshiba MK8007GAH compare to other drives?
Review Toshiba MK8007GAH specifications
Top
Page
Image
Contents