Allied Telesis GS900/5E manual Installation

Page 34

Chapter 2: Installation

9.Power ON the end-nodes connected to the switch.

10.Check that all the SPD/LINK/ACT LEDs are green. If any of the LEDs are OFF, refer to “Troubleshooting” on page 37 for instructions.

The switch is now ready for use.

34

Image 34
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Preface Safety Symbols Used in this Document Symbol Meaning DescriptionWhere to Find Web-based Guides Warranty Contacting Allied TelesisManagement Software Updates Product Description ChapterFeatures StandardsComponents Front PanelsHardware Feature Description Twisted Pair PortsMaximum Distance AC Power Connector Ethernet Switching Basics MAC Address TableDuplex Mode Store Forward Power Workgroup Topology Network TopologiesCollapsed Backbone Installation Reviewing Safety Precautions Selecting a Site for the Switch Planning the Installation Speed Type of Cable MaximumUnpacking the Switch Installing the Switch on a Table or Desktop Installation Installing the Switch on a Wall Attaching the brackets to the sides of the switch1303 Page Installing the Switch in a Rack Attaching Rackmounting Brackets606 Installation Cabling the Switch Powering On the Switch Troubleshooting Environmental Specifications Technical SpecificationsPhysical Specifications Power SpecificationsRJ-45 Twisted Pair Port Connectors Safety and Electromagnetic Emissions CertificationsCompliance Standards Pin Signal