ATEN Technology CS-88A user manual 2002-12-27

Page 14

4.Plug the power adapter cable into the Master View’s Power Jack, then plug the adapter into an AC power source.

5.Repeat these steps for any other Third Stage units you wish to connect.

6.Plug in the power adapters for all the Second Stage Master View units.

7.Plug in the power adapter for the First Stage Master View unit.

8.Turn on the power to all the computers.

Note: The Power On sequence requires that all Third Stage units be powered on first. After they are all on, the Second Stage units must be powered on next. After all the Second Stage units are on, the First Stage unit must be powered on. Only after all the Master Views have been powered on in this sequence, can the computers be powered on.

10

CS-88A User Manual

2002-12-27

Image 14
Contents CS-88A 2002-12-27 Packing List Contents Overview Features Computer Hardware RequirementsConsole Cables Cable Purpose Part NumberIntroduction Front ViewConsole Port Section Power JackRear View CPU Port SectionBefore you Begin InstallationSingle Station Installation Two Stage Installation Three Stage Installation 2002-12-27 Hot Plugging CPU Ports OperationHot Plugging Hot Plugging Console PortsPowering Off and Restarting Port ID Numbering Hotkey Port SelectionManual OSDHotkey Port Control Invoking Hotkey ModeHotkeys Selecting the Active Port Port Key In ExamplesSetting the Scan Interval Auto ScanningStarting Auto Scan PausedSkip Mode Hotkey Beeper Control Hotkey Summary TableOSD Operation OSD OverviewHeading Explanation OSD NavigationOSD Main Screen Headings NameOSD Functions F1 GotoF2 List Choice MeaningSetting Function F3 SETSCAN/SKIP ModeScan ScreenF4 ADM + / . and Space View Ports AccessibleSET Quick PortsF7 Scan F8 LoutMVs Computers AppendixComputer Connection Table Stacking and Rack Mounting StackingRack Mounting Clear Login Information Troubleshooting Symptom Possible Cause ActionSpecifications Function SpecificationSetting Default OSD Factory Default SettingsLimited Warranty