Chapter 2: Installing the System
This chapter provides information on installing the Fast
Pre-Installation Requirements
Before you start actual hardware installation, make sure you can provide the right operating environment, including power requirements, sufficient physical space, and proximity to other network devices that are to be connected. Verify the following installation requirements:
∙Power requirements: 100 to 240 VAC (± 10%) at 50 to 60 Hz (± 3Hz). The hub’s power supply automatically adjusts to the input voltage level.
∙The EtherHub should be located in a cool dry place, with at least 10 cm. of space at the front and back for ventilation.
∙Place the hub out of direct sunlight, and away from heat sources or areas with a high amount of electromagnetic interference.
∙Check if network cables and connectors needed for installation are available.
∙Find a suitable location at the center of the devices you want to link, and near a power outlet
Installing the System |