StorCase Technology DE100i-A100 manual Unit ID Select Switch Location

Page 18

Installation

11

 

 

WARNING: Unlocking the carrier unit switches DC power off to the drive. Since disk drives require a short amount of time to spin down, allow about 15 seconds before pulling the carrier unit out of the receiving frame to avoid possible damage to the drive.

3.Use the alignment tool supplied with the DE100i-A100 to select the ID number of the disk drive. Refer to Figure 10 for the location of the ID Select Switch inside the receiving frame. Table 2 lists the valid unit ID numbers available for the drive.

4.After you have selected an appropriate unit number, replace the DE100i-A100 carrier in the receiving frame, and LOCK IT IN PLACE.

NOTE: The lock on the DE100i-A100 receiving frame functions as a lock and a DC power switch for the carrier unit. The lock must be engaged in order to supply power to the carrier and installed drive.

5.Reboot the computer. The new disk is now ready for use, although it may have to be formatted or initialized prior to use with your operating system and applications software.

 

Unit ID

 

Number

 

Display

Unit ID Select

Lock

and DC

Rotating Switch

 

Power

 

Switch

 

Front of Unit

Drive Carrier

Guide

Receiving

Frame

0087

Drive Carrier (removed)

Figure 10: Unit ID Select Switch Location

DE100i-A100 User's Guide - Rev. C02

StorCase Technology, Inc.

Image 18
Contents Data Express DE100i-A100 Data Express DE100i-A100 Limited Warranty Duration of WarrantyDisclaimers Warranty Claim RequirementsFree Technical Support Such damagesDeclaration of Conformity Table of Contents List of Figures List of TablesPackaging Information Serial NumbersReceiving Frame Drive Carrier Package Contents General Description DE100i-A100 Receiving Frame and CarrierReceiving Frame Front Panel Receiving Frame Front PanelReceiving Frame Rear Panel Receiving Frame Unit ID Number and Activity DisplayReceiving Frame Rear Panel Installation Installing the Drive into the Carrier Installation Drive Installation AssemblyInstalling the Receiving Frame Slave Drive SelectSelecting the Unit ID Number Receiving Frame Mounting HolesUnit ID Select Switch Location Unit ID Select Switch Settings Unit ID Select Switch SettingsConnector J2 AT/IDE Interface Signals PinAppendices Physical Specifications Carrier Receiving Frame Appendix a Specifications/DimensionsEnvironmental Specifications Operating Storage Electrical SpecificationsAppendix a Specifications/Dimensions Appendix B Attaching the ON/OFF Key Figure B-1 Attaching the ON/OFF KeyAppendix C Optional Accessories Carrying CaseDrive Cover Drive PlugSolenoid Drive Lock Figure C-4 Solenoid MechanismReaders Comments S I N E S S R E P LY M a I L