INSTALLING THE SWITCH
INSTALLING THE SWITCH
Before installing the switch, verify that you have all the items listed under “Package Contents.” Note that the switch can be installed on any suitably large flat surface or in a standard EIA
Package Contents
The EZ Switch 10/100/1000 includes:
•EZ Switch 10/100/1000 (SMCGS16 or SMCGS24)
•Four rubber foot pads
•
•Appropriate AC power cord
•This User Guide
•SMC Warranty Registration Card
Selecting a Site
Be sure to follow the site selection guidelines below when choosing a location:
•Select a suitable location for the switch:
•It should be accessible for installing, cabling and maintaining the switch.
•The temperature and humidity should be within the ranges listed in the specifications.
•The status LEDs should be clearly visible.