Installation Manual | IMN |
TigerAccess™ EE |
|
|
|
5.1Connecting Uplink Interface
5.1.1Installing Optical Connection
The switch provides uplink
Use the following procedure when installing the optical connection with the LC type SFP module.
1.Cut the optical cables with LC connector to length.
2.Attach the LC connectors.
3.Label and mark the cables.
4.Route and stow the cable in the rack.
5.Insert the SFP module into the service slot for optical connection.
6.Install the cables in accordance with your cabling plan.
7.Connect the fiber optic cable to SFP module.
Fig. 5.1 shows how to install SFP module and fiber optic cable.
Fig. 5.1 Installing the Optical Connection with SFP Module
SMC7824M/VSW | 27 |