Chapter 4
Installation
This chapter describes the installation procedures for your GS108T Gigabit Smart Switch. Switch installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Applying Power
Step 6: Managing the Switch using a Web Browser or the PC Utility
Step 1: Preparing the Site
Before you install the switch, ensure the operating environment meets the site requirements in the following table.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting | • | Desktop installations - Provide a flat table or shelf surface. |
| • | |
|
| screws supplied with your switch. |
|
| |
Access | Locate the switch in a position that allows access to the front panel | |
| front panel LEDs, and access the power connector. |
v1.0, January 2010