CHAPTER 3: INSTALLATION

This chapter describes the installation procedures for your NETGEAR Model FSM7352S Layer 3 Managed Stackable Fast Ethernet Switch. Switch installation involves the following steps:

Step 1: Preparing the site

Step 2: Installing the switch

Step 3: Checking the installation

Step 4: Applying AC power

Step 5: Connecting devices to the switch

Step 6: Installing a SFP module

Step 7: Connecting to the console port to manage the switch for initial configuration

Step 1: Preparing the Site

Before you install your switch, be sure your operating environment meets the operating environment requirements in Table 3-1.

Table 3-1. Site Requirements

Characteristics

 

Requirements

 

 

 

Mounting

 

 

Desktop installations:

 

Provide a flat table or shelf surface.

Rack-mount

 

Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded

installations:

 

and physically secure. You also need the rack-mount kit supplied with your

 

 

switch.

 

 

 

Access

 

Locate the switch in a position that lets you access the front panel RJ-45 ports,

 

 

view the front panel LEDs, and access the rear-panel power connector.

Power source

 

Provide a power source within 6 feet (1.8 meters) of the installation location.

 

 

Power specifications for the switch is shown in Appendix C. Be sure the AC

 

 

outlet is not controlled by a wall switch, which can accidentally turn off power

 

 

to the outlet and the switch.

Environmental

 

 

Temperature:

 

Install the switch in a dry area, with ambient temperature between 0 and 40ºC

 

 

(32 and 104ºF). Keep the switch away from heat sources such as direct

 

 

sunlight, warm air exhausts, hot-air vents, and heaters.

Operating humidity:

 

The installation location should have a maximum relative humidity of 90%,

 

 

non-condensing.

Ventilation:

Operating conditions:

Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure there is adequate airflow in the room or wiring closet where you intend to install the switch.

Keep the switch at least 6 ft (1.83 m) away from nearest source of electromagnetic noise, such as a photocopy machine.

Page 13 of 24

Image 13 Contents
Trademarks Internet/World Wide Web Contents Figures Overview IntroductionFeatures Shows the package contents for the Managed Switch Package ContentsCD ROM Verify that your package contains the followingFront and Back Panels Physical Description10/100/1000 Mbps RJ-45 Ports SFP module bay Console Port LED DescriptionsLabel Description Page Characteristics Requirements InstallationPreparing the Site Checking the Installation Installing the SwitchApplying AC Power Installing the Switch on a Flat SurfaceInstalling a SFP Module Connecting Devices to the SwitchInstalling a Gigabit Ethernet fiber Module into an FSM7352S System Information FSM7352S # network parms 192.168.1.100 255.255.255.0Connecting the stacking modules Layer 2 Services Appendix a Technical SpecificationsLayer 3 Services Switch ManagementPhysical Dimensions Power SupplyEnvironmental Specifications InterfaceSafety Troubleshooting Chart Appendix B TroubleshootingAdditional Troubleshooting Suggestions Table B-1. Troubleshooting Chart Symptom Cause SolutionSwitch Integrity ConfigurationAuto Negotiation Appendix C Default Settings