Using NVIDIA Software
qWrite Recovery Time
Memory timing that determines the delay between a write command and a Precharge command is set to the same bank of memory. Adjustable from 1 to 15.
qW to R Termination Turnaround
The
qRAS to CAS access
The
qRAS to RAS Delay
The
qRefresh Rate
This value is filled in by the system and can not be changed by the user.
qMemory bank switch
The row Precharge time (tRP) is the minimum time between active commands and the read/writes of the next bank on the memory module. Adjustable from 1 to 15.
qR to W Turnaround
The
qR to R Timing
the
qRow Cycle Time
The Row Cycle Time is the minimum time in cycles it take a row to complete a full cycle. This can be determined by tRC=tRAS+tRP. If this value is set too short, it can cause corruption of data. If this value is set too high, it causes a loss in performance but an increase in stability. Adjustable from 1 to 63 cycles
NVIDIA Corporation
October 17, 2007
75