This test checks the Ethernet LAN interface connection.
This test checks the ADSL showtime. If this test returns FAIL, all other tests will be skipped.
This test sends ATM OAM F5 Segment loop back request cells to the CO. This test will pass if response cell is received. Since some service providers might not support this test, it could still work even if this test fails. If this test fails consistently and the ADSL modem seems not working, make sure the VPI and VCI are configured correctly.
This test sends ATM OAM F5 End to End loop back request cells to the CO. This test will pass if response cell is received. Since some r service providers might not support this test, it could still work even if this test fails. If this test return FAIL consistently and the ADSL modem seems not working, make sure the VPI and VCI are configured correctly.
This test checks the ATM AAL5 module is loaded correctly.
This test checks the PPPOE connection.