Falcon SG800-2T, SG800-1T specifications Installation Procedure for Extended Battery Banks

Page 9

TYPICAL EXTENDED BATTERY BANK & UPS INTERCONNECTION

(Mini-tower models shown; same applies for floor standing banks)

TO ADD MORE BANKS,

 

DAISY CHAIN TO NEXT

 

BANK FROM THIS

2ND CABLE

 

 

 

 

 

 

 

 

OPTIONAL BATTERY

 

 

 

 

 

OPTIONAL BATTERY

 

CHARGER CIRCUIT

 

 

 

 

 

CHARGER CIRCUIT

 

BREAKER

 

 

 

 

 

BREAKER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER INLET FOR

POWER INLET FOR

 

 

 

OPTIONAL CHARGER

 

OPTIONAL CHARGER

 

 

 

 

 

 

2ND BATTERY BANK

 

1ST BATTERY BANK

TYPICAL

1ST CABLEBATTERY CONNECTOR

UPS

BATTERY

FUSE

UPS

INSTALLATION PROCEDURE FOR EXTENDED BATTERY BANKS

1.Remove the battery fuse located on the UPS rear panel. See illustration above.

2.Locate the battery interconnect cable(s).

3.Connect one end of the battery interconnect cable to the the UPS battery

connector. Connect the other end of the cable to the top battery connector on the first battery bank. See illustration above.

4.If a second battery bank is to be connected, connect one end of the second battery interconnect cable to the bottom battery connector on the first battery bank and connect the other end of the cable to the top battery connector of the second battery bank. (See illustration above.)

5.Follow the instructions in the proceeding step for additional battery banks.

6.Reinstall the battery fuse. A popping sound may be heard when inserting the fuse.

This is normal as the battery banks are pre-sharing the UPS.

7.For all battery banks that have the battery charger option installed from the factory, perform the following:

a.Verify the battery charger circuit breaker is in the off (down) position.

b.On the battery bank nameplate label located on the rear panel, verify the battery charger input voltage matches your utility source (120Vac or 230Vac).

c.Connect the input line cord(s) to the battery bank(s) power inlet.

d.Plug the other end of the power cord into a utility receptacle.

e.Turn on the battery charger circuit breaker(s) (up).

f.The batteries in the external battery banks are now being charged.

NOTE:

Internal battery bank chargers do not charge the batteries inside the UPS.

NOTE:

When the battery banks and UPS need placed shutdown for more than

 

two weeks, turn off the battery charger circuit breaker, disconnect the

 

interconnecting cables and remove the battery fuse from the UPS battery or

 

damage may occur.

8.RETURN TO PAGE 5, Paragraph 8 FOR FURTHER INSTALLATION INSTRUCTIONS. 7

Image 9
Contents Owners Operating Manual Table of Contents SG Series ON-LINE UPS System Block Diagram Important Safety Instructions Extended Battery Bank Option Input Power Factor CorrectionTrue Regenerative On-Line Design Microprocessor ControlInstallation Instructions Page SW1 Typical Extended Battery Bank & UPS Interconnection Installation Procedure for Extended Battery BanksFor 800VA-1KVA Models SG800VA-3kVA Tower Extended Battery Bank Selection GuideOperation Load Level Indicator LedsInverter Indicator LED Category one alarms Audible AlarmsCategory two alarms = UPS Output Voltage is of RangeRear Panel Details SG800-1T & SG1K-1T Typical Rear Panel OverviewSG800-2T & SG1K-2T Typical Rear Panel Overview SG1.5K-2T, SG2K-2T & SG3K-2T Typical Rear Panel Overview SG1.5K-1T, SG2K-1T & SG3K-1T Typical Rear Panel OverviewBreaker Communications Interfaces LocationSupported Protocols No on-bypass signal With on-bypass signalTypical Falcon Dry Contact Relay Board No-bypass signal Typical Falcon Opto-coupler Interface CardOpto Board Internal Circuitry APC Style Board APC Style Dry Contact Relay BoardCare & Maintenance Battery Life vs. TemperatureBattery Replacement FCC Considerations Storing the UPS and BatteriesRequesting Technical Information or Support Technical SupportSUPPORT@FALCONUPS.COM 800.842.6940 Falcon Web SupportFalcon ELECTRIC, INC NEW Product Limited WarrantySG SeriesTM UPS Plus 2kVA 3kVA 2kVA & 3kVA