2 Preparation before Installation
2 Preparation before Installation
Unpack the Package
Before you begin the installation of
Fast Ethernet Switch, make sure that you package. Follow the steps below to unpack
1.Clear out an adequate space to unpack the package carton.
2.Open the package carton and take out the contents carefully.
3.Put back all the shipping materials such as plastic bag, paddings and linings into the package carton and save them for future transport need.
After unpacking and taking out the entire package contents, you should check whether you have got the following items:
⌧
⌧One AC power cord
⌧
⌧Support
If any of these above items is missing or damaged, please contact your local dealer for replacement.
6
Ecom ES24F2G Gigabit Ethernet Switch User’s Manual V1.0