Zhone Technologies 5620 installation instructions DSL Access without a Pots Splitter, Dsl Rtu

Page 4

DSL Access without a POTS Splitter

When the Hotwire 5620 RTU is installed without a POTS splitter, a second telephone wiring pair is needed for DSL access.

Customer Premises (CP)

Central

Office

(CO)

Network

Service

Provider

(NSP)

Demarcation

Point

Local Loop

Punchdown Block or NID

POTS

 

 

 

 

End-user

DSL

RTU

Systems

DSL Jack

 

 

 

Ethernet

 

Ethernet

Crossover or

Cable

 

Cable

 

 

 

 

Hub

 

 

97-15345-02

DSL – Digital Subscriber Line

POTS – Plain Old Telephone Service

NID – Network Interface Device

RTU – Remote Termination Unit

New Wiring Connections

 

 

Existing Wiring (POTS)

 

 

4

Image 4
Contents Before You Begin Wiring and Cables NeededDocument Number Document Title Package Checklist What Does the Hotwire Radsl RTU Do?DSL Access with a Hotwire 5030 or 5038 Pots Splitter Network Service Provider DSL Access with a Hotwire 5038 Distributed Pots SplitterCustomer Premises CP DSL Access without a Pots Splitter DSL RTUProcedure Installing the DSL Access WiringPunchdown Block Telephone Network Interface Device NID DSL/POTSPOTS/DSL RJ11 Wall JackHotwire RTU Installing the Hotwire 5620 RTUPots Splitter Ethernet Line Ferrite Optional RTU Wall Placement RTU Hardware Template Power-On Alarm redStatus LEDs Condition StatusTroubleshooting LED Symptom ActionIncreasing the Number of End-User Systems NSPCables & Connectors Pin # FunctionModel 5620 RTU Technical Specifications SpecificationImportant Safety Instructions Declaration of Conformity Canada EMI Warnings Trademarks Warranty, Sales, and Service InformationDocument Feedback