Asante Technologies 3500 manual Installing Optional Hardware Modules, Gbic Care and Handling

Page 18

2.8.3 GBIC Care and Handling

Follow these GBIC maintenance guidelines:

Unnecessary removal and insertion of a GBIC can lead to its premature failure. A GBIC connector has a lifetime of 100 to 500 removals/insertions

GBICs are static-sensitive. To prevent ESD damage, follow your normal board and component handling procedures

GBICs are dust-sensitive. When the GBIC is stored or when a fiber-optic cable is not plugged in, always keep plugs in the GBIC optical bores

Use an alcohol swab or Kim-Wipe to clean the ferrules of the optical connector. The most common source of con- taminants in the optical bores is debris picked up from the optical connectors

2.9Installing Optional Hardware Modules

Follow the steps below to install your media modules (10/100/1000BaseT, 1000BaseX GBIC, 1000BaseSX or 100BaseFX):

1.Using a flat-bladed screwdriver (not included), remove the slot cover plate from the switch.

2.Touch a grounded, metal object to discharge any static electric- ity on your body, and then remove the module from its protec- tive packaging (being careful not to touch any board compo- nents or connectors).

3.Slide the module firmly into the module slot until it has clicked into place. The module’s faceplate should be aligned with the front panel of the switch.

4.Replace the screws to secure the module, being careful not to overtighten the screws.

5.Connect network cables to the module port.

6.Reset the switch.

For more detailed information on your media modules, refer to the User’s Manual on the CD-ROM.

18

Getting Started Guide

 

Image 18
Contents IntraCore 3500 Series Getting Started GuideQuick Start Guide Table of Contents Getting Started Guide Introduction IC 3548-2GTPackage Contents LEDsLED 2 IC3548-2GT IC3548 Model--Ports Port # Front and Back Panel Descriptions Management and Configuration Console InterfaceWeb-Based Interface Snmp ManagementInstallation and Setup Safety OverviewRecommended Installation Tools Power RequirementsEnvironmental Requirements Installation in an Equipment Rack Installation OverviewChassis Installation/Placement Cooling and AirflowFree-Standing/Desktop Placement Equipment Rack GuidelinesInstalling Gbic Interfaces Installing a GbicRemoving a Gbic Installing Optional Hardware Modules Gbic Care and HandlingConnecting Power Connecting to the Network11.1 10/100BaseTX Ports Cabling Procedures Pin Number Pair Number & Wire Colors Using the Stacking Feature IC3524 only Gigabit Ethernet Ports Cabling ProceduresGetting Started Guide Command Getting Started Guide Appendix a Troubleshooting Getting Started Guide Appendix B Safety and Regulatory Com- pliance FCC Compliance Statement Safety AdvisoryGetting Started Guide Appendix C Features and Specifications FeaturesSpecifications Getting Started Guide Pin Number Signal Name Appendix D Serial Port Pin OutsGetting Started Guide Appendix E Warranty and Support Getting Started Guide Asanté IntraCore 3500 Series USA