2.2 Recommended Installation Tools

You will need the following tools and equip- ment (not included) to install the switch:

Number 1 Phillips screwdriver

Number 2 Phillips screwdriver

3/16-inch flat-blade screwdriver

Antistatic mat or foam

An ESD grounding strap

2.3 Power Requirements

The electrical outlet should be located near the switch and be easily accessible. It must also be properly grounded.

Make sure the power source adheres to the following guidelines:

Power: Auto Switching 110/240 VAC

Frequency range: 50/60 Hz

Maximum input AC Current: 1.0A at 115 VAC full load

2.4Environmental Requirements

The switch must be installed in a clean, dry, dust-free area with adequate air circulation to maintain the following environ- mental limits:

Operating Temperature: 0° to 40° C (32° to 104° F)

Storage Temperature: -20° to 70° C (-4° to 158° F)

Relative Humidity: 10% to 90% relative humidity

Storage Relative Humidity: 10% to 95% relative humidity

14

Getting Started Guide

 

Image 14
Contents IntraCore 3500 Series Getting Started GuideQuick Start Guide Table of Contents Getting Started Guide Introduction IC 3548-2GTPackage Contents LEDsLED 2 IC3548-2GT IC3548 Model--Ports Port # Front and Back Panel Descriptions Management and Configuration Console InterfaceWeb-Based Interface Snmp ManagementInstallation and Setup Safety OverviewEnvironmental Requirements Recommended Installation ToolsPower Requirements Installation in an Equipment Rack Installation OverviewChassis Installation/Placement Cooling and AirflowFree-Standing/Desktop Placement Equipment Rack GuidelinesRemoving a Gbic Installing Gbic InterfacesInstalling a Gbic Installing Optional Hardware Modules Gbic Care and Handling11.1 10/100BaseTX Ports Cabling Procedures Connecting PowerConnecting to the Network Pin Number Pair Number & Wire Colors Using the Stacking Feature IC3524 only Gigabit Ethernet Ports Cabling ProceduresGetting Started Guide Command Getting Started Guide Appendix a Troubleshooting Getting Started Guide Appendix B Safety and Regulatory Com- pliance FCC Compliance Statement Safety AdvisoryGetting Started Guide Specifications Appendix C Features and SpecificationsFeatures Getting Started Guide Pin Number Signal Name Appendix D Serial Port Pin OutsGetting Started Guide Appendix E Warranty and Support Getting Started Guide Asanté IntraCore 3500 Series USA