MECHANICAL INSTALLATION 110SR

NEW / EXISTING CONSTRUCTION INSTALLATION PROCEDURES:

Before You Begin:

Please read and understand all of these instructions thoroughly before beginning any work.

Note that all construction work for the installation of all Tannoy products must be done to local building codes by qualified, licensed installers. A local building inspector should approve any overhead installations. Always use safety goggles when cutting material using a Rotozip™ . Tannoy assumes no liability for cause and effect of improper installation work.

Your Package Includes:

110 SR subwoofer system

11 piece supplied screw package

Pre-Installation ring (PIR - SOLD SEPARATELY)

Individually packaged grille

Tools/ Parts Required:

The following is a list of suggested materials and tools. Your needs may differ slightly at each site:

Rotozip™ cutout tool and Guidepoint™ bit

2-1/2” #8 wood screws

Cordless screw gun

Combination square and /or tape measure

Additional 2” x 4” lumber, in 24” pieces

Trim saw (optional)

Site Preparation and Installation Procedures:

Please note that the 110SR is designed for installation in a ceiling with exposed ceiling joists. The PIR must be secured to the support structure; drywall alone will not support the weight of the subwoofer. Make certain that there is sufficient clearance above the joist (minimum 12”) for the subwoofer installation.

Please refer to the photographs as a guideline for installing the PIR into a wood joist or steel stud ceiling.

1)(Fig. 1) Measure the locations for two 24” strips of 2” x 2” or 2” x 4” blocking. These must be used in order for secure mounting to the PIR with 2-1/2” #8 wood screws. Use a combination square to measure the thickness of the PIR (approx. 5/8”), and then transfer the measurement to the joist.

2)(Fig. 2) Screw the blocking to the joist with several evenly spaced screws. (Fig. 3) Fasten the PIR similarly to the blocking. Note that there are no pre-drilled holes; use the wood screws to go directly through the PIR, keeping a 1” clearance from any “T”-nuts. Note: the PIR must be installed with “T”-nuts on the top side. The PIR is clearly marked for your safety and convenience.

Image 16
Contents Series Subwoofers WARRANTY/DAMAGE Claims UNPACKING-DAMAGE ClaimsSeries Subwoofers and Input Modules 110TB Tile Bridge 110SR Sheet RockPage Table of Contents Cabinet Options 110TB Tile Bridge Cabinet110SR Sheet Rock Cabinet 110CS Corner Subwoofer CabinetPassive standard Input Module OptionsCrossover Passive 70 Volt with crossover Active active subwoofer with 2-channel feed-through Active input module is UL and CSA listedActive 110 Input Module Controls Active Module with output for 2 speakersActive 110 Input Module Controls Mechanical Installation 110TB NEW / Existing Construction Installation Procedures’ x 2’ Tile Grid Installation Procedures Installed subwoofer top view, only two chains attached Suspension points Mechanical Installation 110SR Instalation of blocking for flush mounting of PIR to joists Cutting drywall using the Rotozip SR installation Mechanical Installation 110CS Installation of Corner Rail KITSubwoofer Installation Mechanical Installation 110CS Dimensions 110TB 40 LBSDimensions 110SR 37 LBSDimensions 110CS 56 LBSTechnical Specifications Active Module Ceiling & IN-WALL Loudspeakers 0903