MECHANICAL INSTALLATION 110SR

10)After clearing the remaining debris and dust from the opening, it should look like (Fig. 6). Take note of the location and color of the 11 “T”-nuts, and the location and orientation of the cutout in the PIR. The four corner “T”-nuts are gold in color, to differentiate them from the remaining seven which are for securing the 110SR in place.

11)You must align the cutout on the 110SR with the same control access cutout (indicated with red paint) on the PIR that will allow you to make adjustments to the system later. Orient the signal cable to the cutout, and prepare to make the AC mains connection before completing the next step.

12)Put the subwoofer into place, resting it on an angle (Fig. 7) on the secondary wooden installation “ledge” on the side of the sub; this will assist you in getting a hand free to operate a screw gun (Fig. 8). There are seven 3”, Phillips-head, 8-32 black machine screws for securing the 110SR to the PIR.

13)The subwoofer is normally installed in place after painting is completed to keep the sub looking new (Fig. 9). Installing the grille (Fig. 10) with the four remaining white 3” Phillips-head 8-32 screws completes the

110 SR installation.

Figure 9: Completed subwoofer detail.

Figure 10: Completed subwoofer installation.

 

 

 

 

Figure 11: Rotozip™ showing guidepoint bit.

Image 19
Contents Series Subwoofers UNPACKING-DAMAGE Claims WARRANTY/DAMAGE Claims110TB Tile Bridge 110SR Sheet Rock Series Subwoofers and Input ModulesPage Table of Contents 110CS Corner Subwoofer Cabinet Cabinet Options110TB Tile Bridge Cabinet 110SR Sheet Rock CabinetPassive standard Input Module OptionsCrossover Passive 70 Volt with crossover Active input module is UL and CSA listed Active active subwoofer with 2-channel feed-throughActive Module with output for 2 speakers Active 110 Input Module ControlsActive 110 Input Module Controls NEW / Existing Construction Installation Procedures Mechanical Installation 110TB’ x 2’ Tile Grid Installation Procedures Installed subwoofer top view, only two chains attached Suspension points Mechanical Installation 110SR Instalation of blocking for flush mounting of PIR to joists Cutting drywall using the Rotozip SR installation Installation of Corner Rail KIT Mechanical Installation 110CSSubwoofer Installation Mechanical Installation 110CS 40 LBS Dimensions 110TB37 LBS Dimensions 110SR56 LBS Dimensions 110CSTechnical Specifications Active Module Ceiling & IN-WALL Loudspeakers 0903