Tannoy SUBWOOFERS manual Suspension points

Page 15

15

MECHANICAL INSTALLATION 110TB

7)In this photo (Fig. 15) we have removed the threaded rod, and installed eyebolts with backing nuts into the couplers, as described earlier. Detail of the connection with wire rope is shown in (Fig. 8), which is identical top and bottom. Take measurements to approximate the lengths of rope you will need. It might be convenient to make some, or perhaps all of your wire ropes on the ground, and use a quick link (Fig. 7) on each end to connect between both the suspension point and at the subwoofer. Again, it is important to follow local code and regulations for use of wire rope in overhead suspension. Check with your supplier for additional instructions on its use.

8)Once two installers have raised the subwoofer to the ropes and the sub is safely suspended, it can be leveled by adjusting the rope lengths. Check for even tension on all ropes, and note that it is much easier to let some wire slip out of the tighter ropes, rather than trying to pull up and tighten the loose ropes. Once the subwoofer is level, the installation is complete.

Figure 13: Suspension points

Figure 14: Leveled subwoofer

with turnbuckles installed

 

 

 

 

 

Figure 15: Eyebolts in place of threaded rod

Figure 16: Leveling the subwoofer

Image 15
Contents Series Subwoofers UNPACKING-DAMAGE Claims WARRANTY/DAMAGE Claims110TB Tile Bridge 110SR Sheet Rock Series Subwoofers and Input ModulesPage Table of Contents 110CS Corner Subwoofer Cabinet Cabinet Options110TB Tile Bridge Cabinet 110SR Sheet Rock CabinetInput Module Options Passive standardCrossover Passive 70 Volt with crossover Active input module is UL and CSA listed Active active subwoofer with 2-channel feed-throughActive Module with output for 2 speakers Active 110 Input Module ControlsActive 110 Input Module Controls NEW / Existing Construction Installation Procedures Mechanical Installation 110TB’ x 2’ Tile Grid Installation Procedures Installed subwoofer top view, only two chains attached Suspension points Mechanical Installation 110SR Instalation of blocking for flush mounting of PIR to joists Cutting drywall using the Rotozip SR installation Installation of Corner Rail KIT Mechanical Installation 110CSSubwoofer Installation Mechanical Installation 110CS 40 LBS Dimensions 110TB37 LBS Dimensions 110SR56 LBS Dimensions 110CSTechnical Specifications Active Module Ceiling & IN-WALL Loudspeakers 0903