Tannoy SUBWOOFERS manual Mechanical Installation 110CS

Page 22

22

MECHANICAL INSTALLATION 110CS

5)Install the 4 supplied 3/4” wood screws being careful not to strip the holes in the subwoofer.

Two additional anchor screws should be installed up near the top rear edge of the subwoofer in the cavity where the control panel is located. The position of these two screws should correspond to the vertical pencil lines drawn earlier.

6)Drill a hole in the cabinet at each pencil line, 1” from the top edge of the cabinet and install an appropriate lag screw* through each and into the wall studs.

PLEASE NOTE that there will be a space between the wall and the cabinet.

These two screws should be firm, but do not attempt to over tighten or close the cabinet/wall gap by force of the screw. The screws are for preventing the subwoofer from falling forward and do not support the weight of the unit. (Fig. 3)

7)Once the unit is level and secure, reinstall the bottom panel and its spacers with the Allen head bolts removed earlier. Peel off and remove the bottom rubber feet if desired.

8)Replace the snap-on lid once all connections and adjustments to the interface panel have been made. (See “Interface Module Options” for details.)

* NOTE: As wall thickness and materials vary, we do not provide lag screws for the wall mounting of the rails.

Figure 3

Figure 4

Image 22
Contents Series Subwoofers WARRANTY/DAMAGE Claims UNPACKING-DAMAGE ClaimsSeries Subwoofers and Input Modules 110TB Tile Bridge 110SR Sheet RockPage Table of Contents 110SR Sheet Rock Cabinet Cabinet Options110TB Tile Bridge Cabinet 110CS Corner Subwoofer CabinetPassive standard Input Module OptionsCrossover Passive 70 Volt with crossover Active active subwoofer with 2-channel feed-through Active input module is UL and CSA listedActive 110 Input Module Controls Active Module with output for 2 speakersActive 110 Input Module Controls Mechanical Installation 110TB NEW / Existing Construction Installation Procedures’ x 2’ Tile Grid Installation Procedures Installed subwoofer top view, only two chains attached Suspension points Mechanical Installation 110SR Instalation of blocking for flush mounting of PIR to joists Cutting drywall using the Rotozip SR installation Mechanical Installation 110CS Installation of Corner Rail KITSubwoofer Installation Mechanical Installation 110CS Dimensions 110TB 40 LBSDimensions 110SR 37 LBSDimensions 110CS 56 LBSTechnical Specifications Active Module Ceiling & IN-WALL Loudspeakers 0903