4.0 SETTING UP THE SCALE
∙ Take the scale out of the box.
∙ Unwind the load cell cable (number 2 on the diagram).
∙ Run the cable up through the pillar from the base of the scale.
∙ Use the 4 screws (number 3 on the diagram) to mount the pillar to the indicator.
∙ Connector the plug and socket (number 6 and 7 on the diagram) and insert the pole into the pole holder.
∙ Secure the pole to the pole holder by inserting the 2 screws (number 9 on the diagram).
∙ Secure the height rod into the height rod holder (number 4 and 8 on the diagram).
1 indicator
2
cable to indicator
3 screw
4
height rod
6
5
pole
plug
7
socket
10 platform
9
screw
8
height rod holder
© Adam Equipment Company 2012 | Page 6 | Rev C5, January 2012 |