Kohler 60RCL, 38RCL, 48RCL Exercise, Automatic Operation with Model RDT or RSB Transfer Switches

Page 17

Automatic Stop

1.When the utility source is restored, the Emergency-to-Normal time delay starts.

2.When the Emergency-to-Normal time delay expires, the load is transferred to the utility.

3.The generator set stops.

2.4.7Automatic Operation with Model RDT or RSB Transfer Switches

If a Kohler Model RDT or RSB transfer switch is used, the engine start contacts from the ATS must be connected to engine start leads 3 and 4 on the generator set.

The RDC2 generator set controller must be in AUTO mode to respond to remote start/stop signals from an ATS or remote switch. Press the AUTO button on the RDC2 controller to put the generator set into automatic mode.

Automatic Start

The engine start contacts on the ATS close to signal the generator set to start, and remain closed while the generator set is running.

Automatic Stop

The engine start contacts on the ATS open to signal the generator set to stop.

2.5 Exercise

The RDC2 controller can be set to automatically run the generator set at the same time and day every week or every other week. Exercising the generator set every week or every two weeks is required in order to keep the engine and alternator in good operating condition.

Three exercise modes are available: unloaded cycle, unloaded full speed, and loaded full speed. See Sections 2.5.1 through 2.5.3 for information about the exercise modes. A loaded exercise can be set at the RDC2 controller only if a Model RXT transfer switch is connected.

Note: With the RDT and RSB transfer switches, it is possible to have two exercise settings (one unloaded exercise set at the generator set controller, and another exercise set at the ATS controller). If the exercise times overlap, the ATS exercise setting takes priority.

If a Model RDT or RSB transfer switch is used, refer to the instructions provided with the transfer switch to set a loaded exercise at the ATS, if desired.

2.5.1Unloaded Cycle Exercise with Complete System Diagnostics

An unloaded cycle exercise runs the generator set without signalling the transfer switch to transfer the electrical load from the utility source to the generator set. The Unloaded Cycle exercise with diagnostics is the recommended exercise mode and is the factory-default exercise setting.

The Unloaded Cycle exercise runs the engine for 20 minutes in the cycle shown in Figure 2-1 and described below.

DRuns at reduced speed for 10 minutes to warm up and exercise the engine.

D Ramps up and runs at full speed for 3 minutes. Engine diagnostics are performed during this full-speed portion of the cycle, which provides the best test of engine and alternator power backup capability. Diagnostic tests at full speed can identify potential problems with the power output and alert the operator before an emergency event.

D Ramps down and runs at reduced speed for 5 minutes to cool down the engine before shutting down automatically.

Speed, RPM

 

3 min.

 

 

1 min.

1 min.

Engine

10 min.

 

5 min.

 

 

 

Engine

Full-Speed

Cooldown

 

Exercise

Diagnostics

 

Figure 2-1Unloaded Exercise Cycle

System Diagnostics

During the unloaded cycle exercise, the controller monitors the following data. The controller display indicates an unloaded exercise run during the diagnostics, unless a fault is detected as described below.

TP-6810 11/13

Section 2 Generator Set Operation 17

Image 17
Contents TP-6810 11/13b RDC2Product Identification Information Accessory Number Accessory DescriptionController Identification Generator Set Identification NumbersTable of Contents Appendix a Abbreviations Scheduled MaintenanceTroubleshooting Battery Safety Precautions and InstructionsAccidental Starting Accidental starting Can cause severe injury or deathFuel System Engine Backfire/Flash FireExhaust System Hazardous voltage Will cause severe injury or death Hazardous NoiseHazardous noise Can cause hearing loss Hot coolant and steam Can cause severe injury or death Heavy EquipmentHot Parts Nameplate IntroductionLiterature Type Part Number List of Related LiteratureService Assistance Service Assistance TP-6810 11/13 NON-SERVICE Side Service Views 260RCL Service Views Generator Set Operation Prestart ChecklistOperating Area Keep the generator set area clear. Maintain at leastGenerator Set Operation Exercising the Generator SetUnloaded Cycle Exercise with Complete System Diagnostics Automatic Operation with Model RDT or RSB Transfer SwitchesSystem Diagnostics ExerciseExerciser Reset Power Failure During ExerciseSetting the Exerciser at Power-up Unloaded Full-Speed ExerciseProcedure to Change the Exercise Setting Changing the Exercise Setting2RDC2 Main Menu 3Procedure to Set the Exerciser Resetting the Controller after a Fault Shutdown FaultsATS Communication Errors Procedure to Reset the Controller after a Fault ShutdownFault Shutdown SD Condition Check 5Controller Fault Messages Procedure to View Event History Model RXT Transfer Switch OperationSetting Event LogATS Load Control Relay Time Delay Time DelaysATS Control Sequence of Operation Preferred Source FailsRDC2 Controller Operation Controls and IndicatorsButton Controller Keypad LED IndicatorsButton Function LED OperationActive Alert LCD DisplayBattery Charging Controller PowerChanging Settings Procedure to Change Settings6Changing Settings Changing Settings on the RDC2 ControllerMain Menu Controller MenusEngine Metering Menu Overview MenuVoltage Calibration Generator Metering MenuGenset Run Time Menu Generator Set Information MenuSetting the Exerciser Voltage Regulator VR Voltage AdjustAdjusting the Display Contrast Genset System Menu14ATS Status Menu, with Calibration ATS Status MenuChanging ATS Configuration Settings ATS Configuration MenuDate and Time 02Dec2011 1234pm Time Format 12hr24hr Date and Time Menu17Networking Information Menu Networking Information MenusDhcp Networking Status SubmenuOnCue Password Networking Configuration Submenu OnCue Password20RBUS Information Submenu Rbus Information Submenu21Remote Devices Submenu Remote Devices SubmenuProgrammable Interface Module PIM Menus 23Load Control Status Menu Load Control MenusGeneral Maintenance Scheduled MaintenanceEvery Operation Daily Service ScheduleLubrication System Oil SpecificationsOil Check Oil AdditionsReset the maintenance timer on the RDC2 Air CleanerAir Cleaner Service Procedure Check for leaksExhaust System Inspection Points Cooling SystemChecking and Filling Coolant Flushing and Cleaning Procedure Flushing and CleaningCooling System Inspection Draining Cooling SystemModel Spark plug gap 38 RCL, 48RCL, and 60RCL Ignition System511 Storage Procedure Scheduled Maintenance TP-6810 11/13 Fault Messages TroubleshootingIntroduction USB PortProblem Possible Cause Corrective Action Generator Set Troubleshooting2RDC2 Troubleshooting Chart Controller TroubleshootingTroubleshooting TP-6810 11/13 Ansi Appendix a AbbreviationsLCB Page 2012, 2013 by Kohler Co. All rights reserved