Argee MSA-004-004 quick start Install the Chassis into the Rack

Page 18

Install the Chassis into the Rack

CAUTION: Before installing the chassis into the rack:

Make sure that the rack is securely anchored onto an unmovable surface or structure before installing the chassis into the rack.

Unplug power cord(s) of the rack before installing the chassis into the rack.

Make sure that the system is adequately supported. Make sure that all the components are securely fastened to the chassis to prevent components fall- ing off from the chassis.

The rack assembly should be properly grounded to avoid electric shock.

The rack assembly must provide sufficient airflow to the chassis for proper cooling.

Please make sure that all components and all chassis covers are properly in- stalled in the chassis before you install the chassis into the racks; otherwise, out-of-warranty damage may occur.

Slide the chassis into the rack and secure it with two screws on each side of the rack as shown in the picture.

14

8e6 Threat Analysis Reporter Quick Start Guide

Image 18
Contents Guide 8e6 Enterprise Filter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerOptional Install the Chassis Rails Rack Mount Instructions8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Check the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Step-by-Step Setup Requirements Initial Setup ProceduresStep-by-Step Setup Procedures Monitor and Keyboard SetupSerial Console Setup Portion of chassis rearHyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Step-by-Step Initial Setup Procedures Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Setup Wizard Confirmation screen Administration menuSystem Status Screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementWizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register Gauges Specify Gauge Groups to be MonitoredView, Edit Gauge Components Server Settings Conclusion LED Indicator Key Button Key LED Indicator Color Condition DescriptionMSA Units Electromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility Class a NoticeEC Declaration of Conformity Preliminary Setup Procedures Other Required Installation ItemsUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index