Argee MSA-004-004 quick start Unpack the Unit from the Carton

Page 8

Preliminary Setup Procedures

Unpack the Unit from the Carton

Inspect the packaging container for evidence of mishandling during transit. If the packag- ing container is damaged, photograph it for reference.

Carefully unpack the unit from the carton and verify that all accessories are included. Save all packing materials in the event that the unit needs to be returned to 8e6 Tech- nologies.

The carton should contain the following items:

1 Threat Analysis Reporter unit

1 AC Power Cord

1 Serial Port Cable

1 CAT-5E Crossover Cable

Rack Mount Brackets (2)

1 End User License Agreement (EULA)

1 envelope containing a CD-ROM with a PDF of the Threat Analysis Reporter User Guide. The latest version of the user guide can be obtained from our Web site at http://www.8e6.com/docs/tar_ug.pdf.

NOTES: A coupler is included in the carton if a three-foot CAT-5E crossover cable is packaged with your unit instead of a 14-foot CAT-5E crossover cable.

Inspect the server and accessories for damage. If the contents appear damaged, file a damage claim with the carrier immediately.

WARNING: To avoid danger of suffocation, do not leave plastic bags used for packaging the server or any of its components in places where children or infants may play with them.



8e6 Threat Analysis Reporter Quick Start Guide

Image 8
Contents Guide 8e6 Enterprise Filter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerOptional Install the Chassis Rails Rack Mount Instructions8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Check the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Initial Setup Procedures Step-by-Step Setup ProceduresStep-by-Step Setup Requirements Monitor and Keyboard SetupSerial Console Setup Portion of chassis rearHyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Step-by-Step Initial Setup Procedures Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Setup Wizard Confirmation screen Administration menuSystem Status Screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementWizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register Gauges Specify Gauge Groups to be MonitoredView, Edit Gauge Components Server Settings Conclusion MSA Units LED Indicator Key Button KeyLED Indicator Color Condition Description Safety Compliance Declaration of the Manufacturer or ImporterElectromagnetic Compatibility EMC Electromagnetic Compatibility Class a NoticeEC Declaration of Conformity Unpack the Ethernet Tap Unit from the Box Preliminary Setup ProceduresOther Required Installation Items Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index