How to Install the Rack PDU
Installation guidelines | • For a Rack PDU installed in an enclosed communications rack, the | |
|
| recommended maximum ambient temperature is 45° C (113º F). |
| • | Install the Rack PDU so that it does not reduce the air flow |
|
| required for safe operation of the equipment. |
| • Install the Rack PDU so that there is an even mechanical load. | |
| • Follow the nameplate ratings when connecting equipment to the | |
|
| supply circuit. Avoid overloading the circuits, which could affect |
|
| |
| • | Maintain reliable earthing of the Rack PDU, especially supply- |
|
| connections that do not directly connect to the branch circuit. |
| • Install the Rack PDU so that the power plug is accessible to be | |
|
| disconnected for service. |
Attach the cord | Attach the cord retention tray to the Rack PDU, using four | |
retention tray | screws (provided) per tray. |
| Mount an additional cord retention tray to secure cords |
| from the top bank of outlets. Purchase additional tray kits |
| from APC (AP9569). |
| Note |
Additional cord | Attach a second cord retention tray to the PDU, with the cord retainers |
retention tray (optional) | facing down. |
Switched Rack PDU Installation and Quick Start | 3 |