APC AP9613, AP9810 manual Installation steps

Page 16

Installation steps

Warning: After installation, it is strongly recommended that you fully test your configuration before putting it into a production environment.

1.Make all connections to the Dry Contact I/O SmartSlot Card to support your configuration before continuing. See “Itemizing the input contact and output relay terminal blocks” on page 6 for information on making the connections.

Electrostatic discharge: The Dry Contact I/O SmartSlot Card is sensitive to static electricity. Handle the Card by the end plate only. Do not touch the exposed printed circuit board.

2.Use a #2 Phillips-head screwdriver to remove the two screws retaining the slot cover on the host device. Keep the screws for use later. Keep the slot cover for future use.

12

Dry Contact I/O SmartSlot Card

Image 16
Contents Installation and Configuration AP9613This manual is available in English on the enclosed CD Contents Disclaimer Safety Overview Important Safety InformationIntroduction Product OverviewProduct description Hardware and software requirements and tools needed Itemizing the features of the Dry Contact I/O SmartSlot Card Showing the product detailName Description Itemizing the input contact and output relay terminal blocks Configuring the Dip Switches Location of dip switchesDip switches input and outputs Configuration Configuration 3 ConfigurationPlanning your installation InstallingOperating considerations Dry Contact I/O SmartSlot Card Connection strategies Installation steps Dry Contact I/O SmartSlot Card Connecting to the configuration utility Dry Contact I/O SmartSlot Card Specifications ElectricalRatings for input contacts and output relays Voltage Rating Current Rating MaxWarranty Two-Year Factory WarrantyTerms of warranty Non-transferable warranty ExclusionsWarranty claims Disclaimer Page Page Page Page Page Page Page APC Worldwide Customer Support 990-0125D 2013
Related manuals
Manual 4 pages 11.28 Kb