CSI SECTION 16611 STATIC UNINTERRUPTIBLE SYSTEM
8.Verify proper charger operation.
9.Document, sign, and date all test results.
E.
4.2MANUFACTURER FIELD SERVICE
A. Worldwide service: The UPS manufacturer shall have a worldwide service organization Available, consisting of factory trained field service personnel to perform
B. Replacement parts: Parts shall be available through the worldwide service organization
24hours a day, 7 days a week, 365 days a year. The worldwide service organization shall be capable of shipping parts within 4 working hours or on the next available flight, so that the parts may be delivered to the customer site within 24 hours.
4.3MAINTENANCE CONTRACTS
A complete offering of preventative and full service maintenance contracts for the UPS system and the battery system shall be available. All contract work shall be performed by APC factory trained service personnel.
4.4TRAINING
UPS service training workshop: A UPS service training workshop shall be available from the UPS manufacturer. The service training workshop shall include a combination of lecture and practical instruction with
End Of Section 16611