Toshiba 431A 11.7 431B Backup Runtime Tables, 431B Factory Supplied Shunt Trip Wiring

Page 46

1.Run the pre-wired shunt trip cable shown in Figure 11.7 from the 431B through the 431B/UPS cable access port located at the bottom left side of the 431B, to the UPS 24VDC power supply on the lower left side of the UPS.

2.Plug the shunt trip cable connector into the shunt trip receptacle in the lower left front of the UPS. (The connectors are keyed to only plug in one way.)

3.Reinstall the dead fronts.

Figure 11-7 - 431B Factory Supplied

Shunt Trip Wiring

11.7431B Backup Runtime Tables

The following give the typical backup runtimes at various loads for a single cabinet 431B.

UPS

Capacity

PF

 

 

 

Runtime in Minutes at % Full Load

 

 

 

 

 

 

100%

90%

80%

70%

60%

50%

40%

 

30%

20%

10%

4300

30kVA

0.8

17

21

24

30

38

45

59

 

>90

>90

>90

4300

30kVA

0.9

15

17

20

24

33

38

53

 

74

>90

>90

4300

50kVA

0.8

8

9

11

14

17

24

32

 

46

70

>90

4300

50kVA

0.9

7

8

9

11

15

20

26

 

44

60

>90

38

4300 Series Ancillary Cabinets Installation and Operation Manual

Image 46
Contents Series Ancillary Cabinets Page Series Product Use and Warranty Restrictions Qualified Personnel onlyUninterruptible Power System UPS Toshiba Customer Support Center PurposeToshiba Customer Support Center Toshiba International CorporationContents Toshiba Battery Cabinet w/ HX-205 431Bx000xxER111 11 431B Toshiba Battery Cabinet431M MBS Cabinet Installation Guide Introduction Symbols General Safety InstructionsProhibited Symbol indicates do not take action Signal Words Qualified PersonnelMaximum Operating Temperatures Important Safety InstructionsFactory Authorized Personnel Battery Safety Instructions Importantes Concernant LA SécuritéKeep the area around the UPS clean Safety PrecautionsGeneral Maintenance DisclaimerTransporting Avoid vibration or shock exceeding 0.5 gTransporting By Forklift Transporting by ForkliftInspection/Storage Install the ancillary cabinet in a controlled environment Installation PrecautionsKeep the Specified Clearance around the UPS Metal Conduit is not AN Acceptable Ground Conductor Routing and GroundingConnect only one 1 ground wire to the earth ground terminal Wiring/ConnectionPerform wiring and connections with correct polarity Follow the torque criteria for tightening screwsPage Storage/Operating Environment Operating PrecautionsStorage Environment Page Qualified Personnel only Maintenance PrecautionsQualified Personnel shall Installation Keep the Specified Clearance around the ancillary cabinetsUnpacking UPS ClearanceAnchor Bolts 431A/431B 431MGrounding Wire Example UPS Ground Bus4300 Series System Assembly Series Overview4300 UPS 431B Batt. Cabinet Optional10 431A Toshiba Auxiliary Cabinet 431A431A Assembled All cabinets are O’Brien Black TexturedAlternative Configurations Auxiliary Cabinet Warning Labels431A with 431M and 4300 UPS Bolt Tightening Specifications Torque431A with the 4300 UPS Compression Fittings431A Input/Output Power Cable Sizes OutputAnchor the 431A Cabinet 431A Base Anchor Points431A Join the Auxiliary Cabinet with the UPSSeries UPS 431M Join the 431A Cabinet with the 431MSeries Toshiba Auxiliary Cabinet Outline Drawing 431B Door Closed 11 431B Toshiba Battery Cabinet431B Door Open 11.1 431B Estimated Runtimes 43784 4030841750 480824431B and 4300 UPS Go to Section Place the 431B Cabinet 431B Power Cable Sizes Place the 431B CabinetJoin the Battery Cabinet with the UPS 431B Cable Access PlateComponent Wire the Battery Cabinet to the UPSSeries UPS 431B 11.7 431B Backup Runtime Tables 431B Factory Supplied Shunt Trip WiringToshiba Battery Cabinet Outline Drawing 431B300017ER111, 4318500008ER111 Toshiba Battery Cabinet w/ HX-205 431Bx000xxER11112 431B Door Closed 431B Door Open Battery Cabinet Mccb Detail 12.1 431B Estimated Runtimes69883 41750 Installation Safety Instruction Sizes Lug Tightening Torque Recommended/Maximum Wire size and Torque RequirementBattery Cab 127 Adc 150 aJoin the Battery Cabinet with the UPS Wire the Battery Cabinet to the UPS 12.7 431Bx000xxER111 Backup Runtime Tables 431B Typical Runtimes versus LoadToshiba Battery Cabinet HX-205 Schematic 10 Toshiba Battery Cabinet Outline Drawing 13.1 431M Maintenance Bypass Switch MBS Options 13 431M MBS Cabinet Installation Guide431M Door Closed 431M Door Open 431M Internal Arrangement 431M Cabinet Warning Labels Qualified Personnel only 431M Input/Output Power Cable Sizes 431M with 431A and 4300 UPSSuggested Nema 2-Hole Compression Fittings Locations/Dimension on UPS Base Upper Attach Points similar Place the 431M CabinetJoin the 431M Cabinet with the UPS PCB MBS Operation MBS Mechanical Interlock Plate Operation431M Cabinet Outline Drawing 14 431A MBS/PDU Distribution Purpose4400 MBS/PDU with Front Panels Installed Loto Lock-Out Tag-Out HaspInstalling 4310-30/50-KP-A Optional Kickplate InstallationBox Contents Tools RequiredInsert Side Plate tabs into F/B Plate slots Slide Side Plates in along C-Channel baseAlign the F/B Plate with the UPS front Attach the rear F/B Plate to the back of the UPSCompletion Move Side Plates to outer-most Channel base Installing 4310-30/50-KP-BInstall the F/B Plates Side Kick Plate Plate F/B Kick Plates Back Side SimilarDimensional Data External Layouts/DimensionsElectrical Conduit Knock-out Data Page Page Industrial Division