Siemens S7-300 manual Performing a test run

Page 54
6 Performing a test run

6 Performing a test run

50

Image 54
Contents 04/2007 SIMATIC S7-300 Getting Started for First Time UsersOrder No. 6ZB5310-0NC02-0BA0 Safety Guidelines DangerQualified Personnel Prescribed Usage TrademarksDisclaimer of Liability Page Contents 7 Congratulations1 Welcome To accomplish this, you will perform the following tasks Prerequisites 1 WelcomeValidity You will need a microQuantity Materials and toolsOrder number SiemensIn addition, you will need the following components You can also use theVDE 0805 / EN 60950 / IEC 950 or VDE 0106 Part Page 2 Preparing the PC Installing STEP 7 Lite Installing the driver for the PC Adapter USBOpen the installation file and follow the instructions Setting the interface 1. Open the dialog for setting the PG/PC interface2 Preparing the PC Page 2 Preparing the PC Page 3 Installing and wiring the hardware 3.1 What components are required? Installing and grounding the mounting rail 3.2 Installing the components3 Installing and wiring the hardware 2. Connect the mounting rail to the ground wire2. Install the CPU 312C Installing modules on the mounting rail1. Install the power supply, tighten ing the screws hand-tight1. Cut the cables to the desired 3.3 Wiring the componentsPreparing the cables 2. Remove the insulation and press2. Connect the power cable to the power supply Wiring the CPU 312C and the power supply1. Prepare the power cable 3. Secure the power cableWiring the momentary contact switches 1. Connect the momentary contact switches to the digital inputsWiring the motor 1. Connect the power supply for the digital inputs2. Wire the motor, if available. This step is optional Connecting the front panel connector Checking the line voltage setting 2. If necessary, change the switch position for the line voltageConnecting the CPU 312C and the PC 3.4 Commissioning the hardware1. Connect the USB cable to the PC Adapter and your PC 2. Close the front panel Supplying power to the CPU 312C 1. Connect the supply cable to the supply system3 Installing and wiring the hardware 3. Set the main switch of the power supply to “ON” Testing the connections Page 4 Configuring the control in STEP 7 Lite 4.1 What is a STEP 7 Lite project? Opening the “conveyor” project 4 Configuring the control in STEP 7 Lite4.2 Opening a STEP 7 Lite project 1. Start STEP 7 Lite4.3 Reproducing the module configuration in STEP 7 Lite Creating the module configuration1. Create a new S7-300 station 4 Configuring the control in STEP 7 Lite Page 4 Configuring the control in STEP 7 Lite Setting the parameters of the CPU 312C 1. Set the amount of retentive bit memory to “0”Saving the project 1. Save the project4.4 Establishing the online connection between the PC and CPU 312C Establishing the online connection4.5 Downloading and checking the module configuration to the CPU 312C Performing a memory reset on the CPU 312C1. Delete the old program blocks and configurations from the CPU 312C Downloading the module configuration to the CPU 312C Checking the module configuration Page 5 Opening the program on the PC 5.1 What is a program? 5.2 Opening a program 5 Opening the program on the PC1. Open the program Page 6 Performing a test run 6.1 Downloading the project to the CPU 312C 1. Set the mode switch of the CPU 312C to “RUN” 6.2 Starting the test run6 Performing a test run 2. Press the green momentary con- tact switch to start the motor The motor is switched off The output LED 0.5 lights up. The input LED 0.3 lights upThe output LED 0.3 goes out Page 7 Congratulations Want to know more about SIMATIC S7-300? Contact us 8 Additional information 8.1 Diagnostics / correction of errors 8.2 Additional documentation 8 Additional informationName of manual DescriptionService & Support on the Internet 8.3 SIMATIC Technical SupportPage 8 Additional information
Related manuals
Manual 244 pages 25.52 Kb