JVC KV-V8 service manual 5a Mechanism assembly top side

Page 12

2.1.5 Maintenance and inspection

1. Location of major mechanical parts

 

 

Drum Assembly

A/C Head

 

Stator Assembly

 

 

Capstan Motor

Loading Motor

Guide Rail

 

 

 

 

 

 

FE Head

 

 

 

 

 

Belt (Loading Motor)

 

 

 

 

 

 

Pinch Roller Arm Assembly

Tension Arm Assembly

 

 

 

 

 

Guide Arm Assembly

Pole Base Assembly (SUP)

 

 

 

 

 

Lever Assembly

 

 

 

 

 

 

Control Plate

 

 

 

 

 

Control Cam

Tension Band Assembly

 

 

 

 

 

Change Lever Assembly

 

 

 

 

 

 

Slide

Plate

Reel Disk

Assembly

Reel Disk

Assembly (TU)

 

 

(SUP)

 

Pole Base Assembly (TU)

 

 

 

 

 

 

Fig. 2-1-5a Mechanism assembly top side

Belt (Capstan)

Rotary Encoder

Fig. 2-1-5b Mechanism assembly bottom side

2-2

Image 12
Contents KV-V8 Specificatios KV-V8J Disassembly flow chart How to read the disassembly and assemblyAdjustment information for installation Disassembly/assembly methodFig. D1 Fig. D4 Service position How to set the Service positionMechanism service mode How to set the Mechanism service modeFDP display model FDP display FDP Content Cause EMG detail information Mechanism sensor information Common table of MN*, HD* and M3 Before starting repair and adjustment Precautions Jigs and tools required for adjustmentChecking for proper mechanical operations Manually removing the cassette tape5a Mechanism assembly top side Cleaning LubricationTape DriveReplacement of major parts Before starting disassembling How to set the Mechanism assembling modePinch roller arm assembly 4 A/C head How to removeLever assembly, sub deck assembly, capstan motor Reel disk assembly take upLoading motor Control bracketSub brake assembly take up, control cam Control plateSlide plate Change lever assembly, rotary encoder Take up head, tension arm leverRemove the take up head and tension arm lever Rotor assembly How to remove Stator assemblyUpper drum assembly Guide rail19a Rotary encoder, change lever assembly, control cam Loading arm assemblies supply, take upAttach the surrounding parts of the guide rail Mechanism timing chart Compatibility adjustment Notes Repeat steps 1 to 10 by using the alignment tape A2FM waveform linearity 3 A/C head phase X-value Height and tilt of the A/C headPlay back the alignment tape a Standard tracking preset Tension pole positionPrecaution Required adjustment toolsSwitch settings and standard precautions Required test equipmentsSlow tracking preset KV-V8 No.49625