JVC KV-V8 service manual Cleaning, Lubrication, Tape, Drive

Page 13

2. Cleaning

Regular cleaning of the transport system parts is desirable but practically impossible. So make it a rule to carry out clean- ing of the tape transport system whenever the machine is serviced.

When the video head, tape guide and/or brush get soiled, the playback picture may appear inferior or at worst disap- pear, resulting in possible tape damage.

(1)When cleaning the upper drum (especially the video head), soak a piece of closely woven cloth or Kimu-wipe with alcohol and while holding the cloth onto the upper drum by the fingers, turn the upper drum counterclockwise.

Note:

Absolutely avoid sweeping the upper drum vertically as this will cause damage to the video head.

(2)To clean the parts of the tape transport system other than the upper drum, use a piece of closely woven cloth or a cotton swab soaked with alcohol.

(3)After cleaning, make sure that the cleaned parts are com- pletely dry before using the video tape.

3. Lubrication

With no need for periodical lubrication, you have only to lu- bricate new parts after replacement. If any oil or grease on contact parts is soiled, wipe it off and newly lubricate the parts.

Note:

See the “mechanism assembly” diagram of the parts list for the lubricating or greasing spots, and for the types of oil or grease to be used.

Grease is not required for a replacement cassette hous- ing assembly, as this has been applied at the factory.

4.Suggested servicing schedule for main components The following table indicates the suggested period for such service measures as cleaning,lubrication and replacement. In practice, the indicated periods will vary widely according to environmental and usage conditions.However, the indi- cated components should be inspected when a set is brought for service and the maintenance work performed if neces- sary. Also note that rubber parts may deform in time,even if the set is not used.

System

Parts Name

Operation Hours

~1000H

~2000H

 

 

transport

Upper drum assembly

 

 

A/C head

 

 

 

 

 

 

Lower drum motor assembly

 

 

 

Pinch roller arm assembly

 

 

Tape

Full erase head

 

 

Tension arm assembly

 

 

 

Guide arm assembly

 

Capstan motor

 

 

 

Belt (Capstan)

 

 

 

Belt (Loading motor)

 

 

Drive

Loading motor

 

Reel disk (supply, take up)

 

 

 

 

Clutch unit (supply, take up)

 

 

 

Worm gear assembly

 

 

 

Control plate

 

 

 

Slide plate

 

 

Other

Brush

 

Tension band assembly

 

 

 

 

Rotary encoder

¤: Cleaning

R: Inspection or replacement if necessary

Table 2-1-5a

2-3

Image 13
Contents KV-V8 Specificatios KV-V8J How to read the disassembly and assembly Disassembly flow chartAdjustment information for installation Disassembly/assembly methodFig. D1 Fig. D4 How to set the Service position Service positionMechanism service mode How to set the Mechanism service modeFDP display model FDP display FDP Content Cause EMG detail information Mechanism sensor information Common table of MN*, HD* and M3 Jigs and tools required for adjustment Before starting repair and adjustment PrecautionsChecking for proper mechanical operations Manually removing the cassette tape5a Mechanism assembly top side Lubrication CleaningTape DriveHow to set the Mechanism assembling mode Replacement of major parts Before starting disassemblingPinch roller arm assembly 4 A/C head How to removeReel disk assembly take up Lever assembly, sub deck assembly, capstan motorLoading motor Control bracketControl plate Sub brake assembly take up, control camSlide plate Take up head, tension arm lever Change lever assembly, rotary encoderRemove the take up head and tension arm lever Stator assembly Rotor assembly How to removeUpper drum assembly Guide rail19a Loading arm assemblies supply, take up Rotary encoder, change lever assembly, control camAttach the surrounding parts of the guide rail Mechanism timing chart Repeat steps 1 to 10 by using the alignment tape A2 Compatibility adjustment NotesFM waveform linearity Height and tilt of the A/C head 3 A/C head phase X-valuePlay back the alignment tape a Tension pole position Standard tracking presetRequired adjustment tools PrecautionSwitch settings and standard precautions Required test equipmentsSlow tracking preset No.49625 KV-V8