JVC KV-V8 Loading motor, Control bracket, Lever assembly, sub deck assembly, capstan motor

Page 15

2.2.6 Loading motor

(1)Remove the belt from the worm gear assembly.

(2)Take out the 2 screws (A) and then remove the loading motor.

Note:

When installing the loading motor, hold it so that the label faces upward. Also take care with the wire colors.

(B)

(B)

Sub deck assembly

Red line

(to pin 1 of connector for the loading motor)

Loading motor

Label (Top view)

(A)

(A)

Capstan motor

Fig.2-2-7c

Worm gear assembly

Fig.2-2-6a

Belt

2.2.8 Control bracket

(1)Take out the screw (A) and screw (B).

(2)Remove the control bracket.

2.2.7Lever assembly, sub deck assembly, capstan motor

(1) First remove the belt from the rear side (capstans) of the mechanism assembly.

(2) Take out the slit washer, then remove the lever assem- bly.

(3) Take out the 3 screws (A), then remove the capstan mo- tor and sub deck assembly together.

(4) Take out the 3 screws (B), then remove the capstan mo- tor from the sub deck assembly.

Note:

Before removing the capstan brake assembly, it is re- quired to first remove the worm gear assembly and the control cam.

Back side

Belt

Mechanism assembly

Fig.2-2-7a

(A)

Slit washer

Sub deck

Assembly

Lever assembly

Fig.2-2-7b

(A)(B)

Control bracket

Fig.2-2-8a

2.2.9Reel disk assembly (take up)

(1) Take out the slit washer.

(2) Remove the reel disk assembly (take up).

Slit washer

Reel disk assembly (take up)

Fig.2-2-9a

2-5

Image 15
Contents KV-V8 Specificatios KV-V8J Disassembly/assembly method Disassembly flow chartHow to read the disassembly and assembly Adjustment information for installationFig. D1 Fig. D4 How to set the Mechanism service mode Service positionHow to set the Service position Mechanism service modeFDP display model FDP display FDP Content Cause EMG detail information Mechanism sensor information Common table of MN*, HD* and M3 Manually removing the cassette tape Before starting repair and adjustment PrecautionsJigs and tools required for adjustment Checking for proper mechanical operations5a Mechanism assembly top side Drive CleaningLubrication Tape4 A/C head How to remove Replacement of major parts Before starting disassemblingHow to set the Mechanism assembling mode Pinch roller arm assemblyControl bracket Lever assembly, sub deck assembly, capstan motorReel disk assembly take up Loading motorSub brake assembly take up, control cam Control plateSlide plate Change lever assembly, rotary encoder Take up head, tension arm leverRemove the take up head and tension arm lever Guide rail Rotor assembly How to removeStator assembly Upper drum assembly19a Rotary encoder, change lever assembly, control cam Loading arm assemblies supply, take upAttach the surrounding parts of the guide rail Mechanism timing chart Compatibility adjustment Notes Repeat steps 1 to 10 by using the alignment tape A2FM waveform linearity 3 A/C head phase X-value Height and tilt of the A/C headPlay back the alignment tape a Tension pole position Standard tracking presetRequired test equipments PrecautionRequired adjustment tools Switch settings and standard precautionsSlow tracking preset No.49625 KV-V8