JVC KV-V8 service manual Standard tracking preset, Tension pole position

Page 24

[Perform adjustment steps (7) to (10) only for 2 Head models equipped with LP mode.]

(7)Then play back the alignment tape (A2).

(8)Set the VCR to the manual tracking mode.

(9)Perform the tracking operation and make sure that the V.PB FM waveform is at its maximum.

(10)If it is not at maximum, loosen the screws (4) and (5), and turn the A/C head positioning tool to bring the A/C head to a position, around where the waveform reaches its maximum for the first time. Then tighten the screws

(4) and (5).

Note:

After adjusting, always perform the confirmation and re-adjustment of the item 2.5.4.

A/C head

 

(5)

 

 

positioning tool

 

 

A/C head

 

 

(5)

 

(4)

 

 

To the capstan

 

 

(4)

 

To the drum

 

 

 

Fig. 2-5-3a

 

 

 

Alignment tape

Alignment tape

 

 

[SP, stairstep]

[EP(LP), stairstep]

 

 

played with the

played with the

output

 

SP head

EP(LP) head

 

 

 

Waveform

 

 

 

 

 

X-value adjustment point

Drum side

Control head position

Capstan side

 

 

 

Maximum

 

 

Fig. 2-5-3b

 

2.5.4 Standard tracking preset

 

 

 

[KV-V8E]

 

Signal

(A)

Alignment tape(LP, stairstep, PAL) [MHPE-L]

 

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

 

 

[KV-V8J]

 

 

(A)

Alignment tape(EP, stairstep, NTSC) [MHP-L]

Mode

(B)

PB ¥ Auto adjust

Equipment

(C)

Oscilloscope

 

Measuring point

(D)

TP106 (PB FM)

External trigger

(E)

TP111 (D.FF)

 

Adjustment part

(F)

Jig RCU: Code “50”

Specified value

(G)

STOP mode

 

 

 

(Maximum V.PB FM waveform)

Adjustment tool

(H)

Jig RCU [PTU94023B]

(1)Play back the alignment tape (A).

(2)Apply the external trigger signal to D.FF (E), to observe the V.PB FM waveform at the measuring point (D).

(3)Confirm that the automatic tracking operation is com- pleted.

(4)Set the VCR to the Auto adjust mode by transmitting the code (F) twice from the Jig RCU. When the VCR enters the stop mode, the adjustment is completed.

(5)If the VCR enters the eject mode, perform adjustment for the A/C head phase (X-value) again.

2.5.5 Tension pole position

Signal

(A)

Back tension cassette gauge

 

 

[PUJ48076-2]

 

 

 

Mode

(B)

PB

 

 

 

Adjustment part

(F)

Adjust pin [Mechansim assembly]

 

 

 

Specified value

(G)

29 - 46 gf•cm (2.84 – 4.5 10-3Nm)

(1)Play back the back tension cassette gauge (A).

(2)Check that the indicated value on the left side gauge is within the specified value (G).

(3)If the indicated value is not within the specified value (G), perform the adjustment in a following procedure.

1)Set the VCR to the mechanism service mode. (See 1.5 Mechanism service mode.)

2)Set the VCR to the play back mode and turn the ad- just pin using the flat-blade screwdriver, etc. by pay- ing attention not to come into contact with the 2.5 mm dia. pole. (See Fig. 2-5-5a.)

2.5 pole

Adjust pin

 

Tension arm assembly

Fig. 2-5-5a

2-14

Image 24
Contents KV-V8 Specificatios KV-V8J Disassembly flow chart How to read the disassembly and assemblyAdjustment information for installation Disassembly/assembly methodFig. D1 Fig. D4 Service position How to set the Service positionMechanism service mode How to set the Mechanism service modeFDP display model FDP display FDP Content Cause EMG detail information Mechanism sensor information Common table of MN*, HD* and M3 Before starting repair and adjustment Precautions Jigs and tools required for adjustmentChecking for proper mechanical operations Manually removing the cassette tape5a Mechanism assembly top side Cleaning LubricationTape DriveReplacement of major parts Before starting disassembling How to set the Mechanism assembling modePinch roller arm assembly 4 A/C head How to removeLever assembly, sub deck assembly, capstan motor Reel disk assembly take upLoading motor Control bracketSub brake assembly take up, control cam Control plateSlide plate Change lever assembly, rotary encoder Take up head, tension arm leverRemove the take up head and tension arm lever Rotor assembly How to remove Stator assemblyUpper drum assembly Guide rail19a Rotary encoder, change lever assembly, control cam Loading arm assemblies supply, take upAttach the surrounding parts of the guide rail Mechanism timing chart Compatibility adjustment Notes Repeat steps 1 to 10 by using the alignment tape A2FM waveform linearity 3 A/C head phase X-value Height and tilt of the A/C headPlay back the alignment tape a Standard tracking preset Tension pole positionPrecaution Required adjustment toolsSwitch settings and standard precautions Required test equipmentsSlow tracking preset KV-V8 No.49625