Grizzly g0748, g0747 owner manual G0747 Wiring Diagram, Phase

Page 59

G0747 Wiring Diagram

Hot

 

Ground

SPINDLE SWITCH

 

Hot

G

 

 

 

 

 

 

 

 

Z

220 VAC

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W

3-Phase

 

 

 

 

 

 

 

Hot

 

 

 

 

 

 

 

 

 

NEMA 15-15 Plug

 

 

 

 

 

 

 

 

 

Ground

 

 

 

 

 

 

 

(As Recommended)

 

 

 

 

 

 

 

 

 

 

S

T

R

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

S

T

R

O

 

 

 

 

 

 

R

 

 

 

 

 

 

 

 

 

F

 

 

 

6

5

3

2

 

4

1

 

 

 

6

5

3

2

 

4

1

MOTOR

2W

1W

4

5

 

 

6

2U

 

 

 

2V

 

 

 

 

Ground

1V

 

 

1U

 

3

 

2

1

 

 

 

Model G0747/G0748 (Mfg. Since 8/12)

READ ELECTRICAL SAFETY

-57-

ON PAGE 56!

 

Image 59
Contents For models manufactured since 8/12 Page Table of Contents Wiring Contact Info IntroductionMachine Description Manual Accuracy Front View Identification Model G0747 Headstock Identification Model G0748 Headstock Identification Machine Data Sheet Main Specifications Operation Info Model G0748 Vertical Mill Variable Speed Variable Safety Instructions for Machinery SafetyPage Additional Safety for Milling Machines Circuit Requirements for Power SupplyAvailability Full-Load Current Rating50 ft Grounding InstructionsExtension Cords Minimum Gauge Size 14 AWGUnpacking SetupNeeded for Setup Small Item Inventory Figure Qty InventoryBasic steps for removing rust preventative CleanupBefore cleaning, gather the following Site Considerations To lift and move the mill Lifting & PlacingHEAVy Lift Machine Mounts Leveling & MountingLeveling Bolting to Concrete FloorsTo assemble the mill AssemblyInitial Lubrication Mill Test Run Test RunTo test the power feed Power Feed Test RunSpindle Break-In Inspections AdjustmentsTo perform the spindle break-in procedure Operation Overview OperationsTable Locks Table MovementGraduated Index Rings Axis Power Feed Identification Tool Needed Qty Axis Power Feed OperationTo operate the X-axis power feed Head MovementRotating Head Left/Right Tilting Head Forward/BackwardRotating Ram Ram MovementMoving Ram Forward/Backward Tool Diameter in inches x Spindle SpeedDetermining Spindle Speed Recommended Cutting Speed FPM xTo set the Model G0747 spindle speed Setting Model G0747 Spindle SpeedLow Spindle Speed Range To set the Model G0748 spindle speed Setting Model G0748 Spindle SpeedDownfeed Controls Spindle DownfeedTo use the coarse downfeed Coarse DownfeedFine Downfeed To use the auto-downfeed Auto-DownfeedModel G0747 brake lever G0748 Brake Lever Spindle BrakeTools Needed Qty Loading/Unloading ToolingLoading Tooling Unloading ToolingG1076-52-PC. Clamping Kit AccessoriesG9299-10 Yuasa-Type Rotary Table G7155-6 Precision Milling ViseSchedule MaintenanceCleaning Protecting Quill LubricationHeadstock Gearing Table Ways One-Shot OilerTable Elevation Leadscrew Ram WaysHead Tilt & Ram Pinions To lubricate the power feed gears Power Feed GearsMachine Storage Symptom Possible Cause Possible Solution ServiceTroubleshooting Symptom Possible Cause Possible Solution Saddle gib and adjustment screw Knee Gib Adjustment Screw Adjusting GibsAxis Leadscrew Backlash Adjusting Leadscrew BacklashCross Leadscrew Backlash To tram the spindle to the table Tramming SpindlePage Wiring Safety Instructions WiringG0747 Wiring Diagram G0748 Wiring Diagram Main PartsDescription Main Parts ListDescription Axis LeadscrewsDownfeed System Downfeed System Parts List CAM ROD Sleeve Assembly G0747 Headstock PFH30M Flat HD SCR M5-.8 X G0747 Headstock Parts ListG0748 Headstock G0748 Headstock Parts List Headstock Front COVER, Aluminum One-Shot Oiler Accessories G0747 Machine Labels & Cosmetics G0748 Machine Labels & Cosmetics Model G0747/G0748 Mfg. Since 8/12 Comments Warranty CardBOX BELLINGHAM, WA Grizzly INDUSTRIAL, INCWarranty & Returns