IBM X3950 M2 installation instructions Remove cable slack from CMA hanger brackets

Page 13

IBM System x

Remove cable slack from CMA hanger brackets.

Once all cables are secured in the CMA, pull the system out all the way and pull the scalability cables tight within the CMA hanger brackets. Retighten the cable straps if needed. This will ensure the cables stay in the CMA while sliding the system in and out for hardware maintenance and upgrade activities. This is especially important because thinner cables are used in this M2 generation of the x3950 system compared to the previous version.

13

Image 13
Contents IBM System IBM System Links to System Manuals 8u needed for 2-node system Install slides into rack Install nodes onto the slides Install Enterprise Cable Management Arms onto nodes Connect Scalability Cables to Scalability Ports Install and Route Scalability Cables Recommended Method Install and Route Scalability Cables- Recommended Method Connect power and IO cables to system and route through CMA Secure the cables in the CMA Remove cable slack from CMA hanger brackets Node Cable Setup Verify Cabling Feedback
Related manuals
Manual 19 pages 5.23 Kb