IBM X3950 M2 installation instructions Connect power and IO cables to system and route through CMA

Page 11

IBM System x

Connect power and IO cables to system and route through CMA

NOTES:

1.Use the strain relief cable clamps on the rear of the power supplies for the power cables and the IO cables on the rear of the system. This prevents the cable from sagging and getting caught on the node below.

2.Route the power cables and other IO cables as needed through the blue plastic cable restraint brackets attached to the side of the slide rails.

11

Image 11
Contents IBM System IBM System Links to System Manuals 8u needed for 2-node system Install slides into rack Install nodes onto the slides Install Enterprise Cable Management Arms onto nodes Connect Scalability Cables to Scalability Ports Install and Route Scalability Cables Recommended Method Install and Route Scalability Cables- Recommended Method Connect power and IO cables to system and route through CMA Secure the cables in the CMA Remove cable slack from CMA hanger brackets Node Cable Setup Verify Cabling Feedback
Related manuals
Manual 19 pages 5.23 Kb