IBM X3950 M2 installation instructions Links to System Manuals

Page 3

IBM System x

Links to System Manuals

1.Installation Guide:

￿ftp://ftp.software.ibm.com/systems/support/system_x_pdf/jr1bcms2.pdf

2.Rack Installation Instructions (x3950 M2 starts on page 6):

￿ftp://ftp.software.ibm.com/systems/support/system_x_pdf/jr1birii.pdf

3.The deep-plug design of the scalability cables will help to prevent the cables from becoming disconnected from the port since the connection is actually in the center of the system, not at the rear of the system like previous System x scalable systems.

4.Due to the deep-plug nature of the scalability cables, the lengths are actually longer than previous systems but the actual amount of slack outside the system and the CMA is slightly less than the slack in the xSeries 460/System x3950 system.

5.Thinner gauge cable was chosen for this generation of the scalability cables, and a thinner gauge still will be introduced later in 2008. This reduces the stiffness of the cables and will help the cables route more easily.

6.It is recommended to wrap the cable strap around the scalability cables first to secure them within the brackets, then wrap the strap around the CMA.

3

Image 3
Contents IBM System IBM System Links to System Manuals 8u needed for 2-node system Install slides into rack Install nodes onto the slides Install Enterprise Cable Management Arms onto nodes Connect Scalability Cables to Scalability Ports Install and Route Scalability Cables Recommended Method Install and Route Scalability Cables- Recommended Method Connect power and IO cables to system and route through CMA Secure the cables in the CMA Remove cable slack from CMA hanger brackets Node Cable Setup Verify Cabling Feedback
Related manuals
Manual 19 pages 5.23 Kb