IBM X3950 M2 installation instructions 8u needed for 2-node system

Page 4

IBM System x

8u needed for 2-node system

The length of the scalability cables requires that no empty U-spaces exist between the nodes.

4

Image 4
Contents IBM System IBM System Links to System Manuals 8u needed for 2-node system Install slides into rack Install nodes onto the slides Install Enterprise Cable Management Arms onto nodes Connect Scalability Cables to Scalability Ports Install and Route Scalability Cables Recommended Method Install and Route Scalability Cables- Recommended Method Connect power and IO cables to system and route through CMA Secure the cables in the CMA Remove cable slack from CMA hanger brackets Node Cable Setup Verify Cabling Feedback